VIII Gas Piping

Gas piping to the boiler must be sized to deliver adequate gas for the boiler to fire at the nameplate input at an inlet pressure between the minimum and maximum values shown on the rating plate. For more information on gas line sizing, consult the utility or the National Fuel Gas Code.

Figure 8.1 shows typical gas piping connection to the FCM boiler. A sediment trap must be installed upstream of all gas controls. Install the factory provided manual shut-off valve outside the jacket with a ground joint union as shown.

The boiler and its gas connection must be leak tested before placing the boiler in operation. When doing this, the boiler and its individual shut-off must be disconnected from the rest of the system during any pressure testing of that system at pressures in excess of ½ psi. When pressure testing the gas system at pressures of ½ psi or less, isolate the boiler from the gas supply system by closing its individual manual shut-off valve.

Figure 8.1: Gas Connection To Boiler

32

Image 32
Contents Freedom Table of Contents Specifications Product DescriptionII Specifications Maximum Vent LengthsIII Before Installing IV Locating the BoilerClearances To Combustible Or Non-combustible Material Clearances from Vent Piping to Combustible Construction Floor Mounting Mounting The BoilerWall Mounting Wall Mounting Hole Locations Boiler Mounting/Hardware VI Air for Ventilation Page VII Venting Vent System DesignPage Summary of Horizontal Venting Options Or PVCHorizontal Concentric Venting Vent Option U.S. Boiler Concentric Vent Components Vent Option Size Vent6c Positioning Vent Terminal Under Overhangs VENT/ AIR Intake Fitting Equivalent Length Summary of Vertical Venting Options RoofRemoving an Existing Boiler From a Common Chimney Never Common Vent a FCM Boiler with Other AppliancesAssembly of U.S. Boiler 60/100mm Concentric Venting 11 Dimension L 12 Cutting Outer Pipe 14 Preparing Terminal Section for Installation in the Wall Assembly of Stainless Steel Venting 16 Installation of Stainless Steel Vent Collar17a Star-34 Connection to Vent Collar 18 Z-Vent III Connection to Vent Collar 19 SAF-T Vent EZ Seal Connection to Vent Collar 20 FasNSeal Connection to Vent Collar Condensate Trap and Drain Line 21 Condensate Piping Arrangement Viii Gas Piping Gas Connection To BoilerGeneral System Piping Precautions IX System PipingSystem Design Flow Requirements Through BoilerMethod 1 Primary/Secondary Piping Piping Method #1 Heat Only Piping Method #1 Heat + Indirect Water Heater 4b Piping Method #1 Indirect Water Heater Loop Piping Shaded Pipe and Circulator Sizing for Boiler Loop Pipe and Circulator Sizing for Indirect Water Heater LoopFitting Equivalent Lengths Standard Piping Installation Requirements Boiler Head LossPiping for Special Situations 11 Chiller Piping Wiring Wiring Connections Diagram Ladder Diagram Page XI Start-up and Checkout Never Attempt to Fill a HOT Empty BoilerWater Quality and Boiler Water Additives FCM Series Lighting and Operating Instructions SWT Gas Valve Detail Typical CO2/O2 Combustion Readings RangePage Normal Display In Standby Mode XII OperationPage Basic Menu Tree Boiler Status First Digit Boiler StatusOutdoor Reset Curve XIII. Service and Maintenance Page XIV. Troubleshooting No Error Code DisplayedSoft Lockout Codes Displayed Code Condition Possible CausesHard Lockout Codes Displayed XV Parts Page Parts List KEY DescriptionPage Parts List Page Page Page DISP4D 150 151 152 153 154 155 156 157 158 159 160 161 162 Page Page Page Page Page Limited Warranty