Burnham 101008-01R1-2/07 manual Clearances from Vent Piping to Combustible Construction

Page 6

TABLE 4.2: CLEARANCES FROM VENT PIPING TO COMBUSTIBLE CONSTRUCTION

TYPE OF VENT PIPE

PIPE DIRECTION

ENCLOSURE

MINIMUM CLEARANCE

TO COMBUSTIBLE

 

 

 

MATERIAL

60/100mm

VERTICAL OR

ENCLOSED ON ALL FOUR SIDES

0”

CONCENTRIC VENTING

HORIZONTAL

 

 

HEAT FAB SAF-T VENT

 

AT LEAST ONE SIDE OPEN,

 

PROTECH FASNSEAL

VERTICAL OR

1”

COMBUSTIBLE MATERIAL ON A

Z-FLEX Z-VENT III

HORIZONTAL

 

MAXIMUM OF THREE SIDES

 

FLEX-L STAR-34

 

 

 

 

 

 

 

 

 

HEAT FAB SAF-T VENT

 

 

 

PROTECH FASNSEAL

HORIZONTAL OR VERTICAL

ENCLOSED ON ALL FOUR SIDES

2-1/2”

Z-FLEX Z-VENT III

WITH OFFSETS

 

 

 

FLEX-L STAR-34

 

 

 

 

 

 

 

HEAT FAB SAF-T VENT

 

 

 

PROTECH FASNSEAL

VERTICAL WITH NO OFFSETS

ENCLOSED ON ALL FOUR SIDES

2-1/2”

Z-FLEX Z-VENT III

 

 

 

 

FLEX-L STAR-34

 

 

 

 

 

 

 

6

Image 6
Contents Freedom Table of Contents II Specifications SpecificationsProduct Description Maximum Vent LengthsIII Before Installing IV Locating the BoilerClearances To Combustible Or Non-combustible Material Clearances from Vent Piping to Combustible Construction Mounting The Boiler Wall MountingFloor Mounting Wall Mounting Hole Locations Boiler Mounting/Hardware VI Air for Ventilation Page VII Venting Vent System DesignPage Summary of Horizontal Venting Options Or PVCHorizontal Concentric Venting Vent Option U.S. Boiler Concentric Vent Components Vent Option Size Vent6c Positioning Vent Terminal Under Overhangs VENT/ AIR Intake Fitting Equivalent Length Summary of Vertical Venting Options RoofRemoving an Existing Boiler From a Common Chimney Never Common Vent a FCM Boiler with Other AppliancesAssembly of U.S. Boiler 60/100mm Concentric Venting 11 Dimension L 12 Cutting Outer Pipe 14 Preparing Terminal Section for Installation in the Wall Assembly of Stainless Steel Venting 16 Installation of Stainless Steel Vent Collar17a Star-34 Connection to Vent Collar 18 Z-Vent III Connection to Vent Collar 19 SAF-T Vent EZ Seal Connection to Vent Collar 20 FasNSeal Connection to Vent Collar Condensate Trap and Drain Line 21 Condensate Piping Arrangement Viii Gas Piping Gas Connection To BoilerSystem Design General System Piping PrecautionsIX System Piping Flow Requirements Through BoilerMethod 1 Primary/Secondary Piping Piping Method #1 Heat Only Piping Method #1 Heat + Indirect Water Heater 4b Piping Method #1 Indirect Water Heater Loop Piping Shaded Pipe and Circulator Sizing for Boiler Loop Pipe and Circulator Sizing for Indirect Water Heater LoopFitting Equivalent Lengths Standard Piping Installation Requirements Boiler Head LossPiping for Special Situations 11 Chiller Piping Wiring Wiring Connections Diagram Ladder Diagram Page XI Start-up and Checkout Never Attempt to Fill a HOT Empty BoilerWater Quality and Boiler Water Additives FCM Series Lighting and Operating Instructions SWT Gas Valve Detail Typical CO2/O2 Combustion Readings RangePage Normal Display In Standby Mode XII OperationPage Basic Menu Tree Boiler Status First Digit Boiler StatusOutdoor Reset Curve XIII. Service and Maintenance Page XIV. Troubleshooting No Error Code DisplayedSoft Lockout Codes Displayed Code Condition Possible CausesHard Lockout Codes Displayed XV Parts Page Parts List KEY DescriptionPage Parts List Page Page Page DISP4D 150 151 152 153 154 155 156 157 158 159 160 161 162 Page Page Page Page Page Limited Warranty