Burnham 101008-01R1-2/07 manual Summary of Vertical Venting Options, Roof

Page 19

TABLE 7.8: SUMMARY OF VERTICAL VENTING OPTIONS

VENT OPTION #

CLASSIFICATION USED IN THIS MANUAL

ILLUSTRATED IN FIGURE

VENT PIPE STRUCTURE

AIR INTAKE PIPE STRUCTURE

VENT PIPE SIZE

AIR INTAKE PIPE SIZE

LENGTH

VENT

 

FCM070

 

FCM090

 

 

 

MAXIMUM

INLET

 

FCM120

 

FCM070

 

 

 

 

 

 

FCM090

 

 

 

FCM120

LENGTH

VENT

 

FCM070

 

FCM120

MINIMUM

 

 

FCM090

INLET

 

FCM070

 

 

 

 

 

 

FCM090

 

 

 

FCM120

 

 

 

 

VENT TERMINAL

 

AIR INTAKE TERMINAL

VENT MATERIAL

AIR INTAKE MATERIAL

5

6

VERTICAL

(RESERVED FOR

TWIN PIPE

FUTURE USE)

7.9

 

ROOF

 

ROOF

 

3”

 

3”

 

49.5ft

 

49.5ft

 

49.5ft

 

49.5ft

 

49.5ft

 

49.5ft

 

2ft

 

2ft

 

2ft

 

2ft

 

2ft

 

2ft

 

STRAIGHT TERMINAL

 

BY VENT SYSTEM MFR.

 

(TABLE 7.5)

 

3” 180 ELBOW

 

(FIGURE 7.9)

 

APPROVED STAINLESS

 

STEEL VENT SYSTEM

 

SHOWN IN TABLE 7.5

 

GALVANIZED OR PVC

 

 

 

19

Image 19
Contents Freedom Table of Contents Maximum Vent Lengths SpecificationsProduct Description II SpecificationsIV Locating the Boiler III Before InstallingClearances To Combustible Or Non-combustible Material Clearances from Vent Piping to Combustible Construction Wall Mounting Mounting The BoilerFloor Mounting Wall Mounting Hole Locations Boiler Mounting/Hardware VI Air for Ventilation Page Vent System Design VII VentingPage Or PVC Summary of Horizontal Venting OptionsHorizontal Concentric Venting Vent Option Size Vent U.S. Boiler Concentric Vent Components Vent Option6c Positioning Vent Terminal Under Overhangs VENT/ AIR Intake Fitting Equivalent Length Roof Summary of Vertical Venting OptionsNever Common Vent a FCM Boiler with Other Appliances Removing an Existing Boiler From a Common ChimneyAssembly of U.S. Boiler 60/100mm Concentric Venting 11 Dimension L 12 Cutting Outer Pipe 14 Preparing Terminal Section for Installation in the Wall 16 Installation of Stainless Steel Vent Collar Assembly of Stainless Steel Venting17a Star-34 Connection to Vent Collar 18 Z-Vent III Connection to Vent Collar 19 SAF-T Vent EZ Seal Connection to Vent Collar 20 FasNSeal Connection to Vent Collar Condensate Trap and Drain Line 21 Condensate Piping Arrangement Gas Connection To Boiler Viii Gas PipingFlow Requirements Through Boiler General System Piping PrecautionsIX System Piping System DesignMethod 1 Primary/Secondary Piping Piping Method #1 Heat Only Piping Method #1 Heat + Indirect Water Heater 4b Piping Method #1 Indirect Water Heater Loop Piping Shaded Pipe and Circulator Sizing for Indirect Water Heater Loop Pipe and Circulator Sizing for Boiler LoopFitting Equivalent Lengths Boiler Head Loss Standard Piping Installation RequirementsPiping for Special Situations 11 Chiller Piping Wiring Wiring Connections Diagram Ladder Diagram Page Never Attempt to Fill a HOT Empty Boiler XI Start-up and CheckoutWater Quality and Boiler Water Additives FCM Series Lighting and Operating Instructions SWT Typical CO2/O2 Combustion Readings Range Gas Valve DetailPage XII Operation Normal Display In Standby ModePage Basic Menu Tree First Digit Boiler Status Boiler StatusOutdoor Reset Curve XIII. Service and Maintenance Page No Error Code Displayed XIV. TroubleshootingCode Condition Possible Causes Soft Lockout Codes DisplayedHard Lockout Codes Displayed XV Parts Page KEY Description Parts ListPage Parts List Page Page Page DISP4D 150 151 152 153 154 155 156 157 158 159 160 161 162 Page Page Page Page Page Limited Warranty