Burnham 101008-01R1-2/07 manual 6c Positioning Vent Terminal Under Overhangs

Page 17

Figure 7.6a: Location of Vent Terminal Relative to Windows, Doors, Grade

Figure 7.6b: Location of Vent Terminal Relative to Meters and Forced Air Inlets

Figure 7.6c: Positioning Vent Terminal Under Overhangs

17

Image 17
Contents Freedom Table of Contents Product Description SpecificationsII Specifications Maximum Vent LengthsIV Locating the Boiler III Before InstallingClearances To Combustible Or Non-combustible Material Clearances from Vent Piping to Combustible Construction Floor Mounting Mounting The BoilerWall Mounting Wall Mounting Hole Locations Boiler Mounting/Hardware VI Air for Ventilation Page Vent System Design VII VentingPage Or PVC Summary of Horizontal Venting OptionsHorizontal Concentric Venting Vent Option Size Vent U.S. Boiler Concentric Vent Components Vent Option6c Positioning Vent Terminal Under Overhangs VENT/ AIR Intake Fitting Equivalent Length Roof Summary of Vertical Venting OptionsNever Common Vent a FCM Boiler with Other Appliances Removing an Existing Boiler From a Common ChimneyAssembly of U.S. Boiler 60/100mm Concentric Venting 11 Dimension L 12 Cutting Outer Pipe 14 Preparing Terminal Section for Installation in the Wall 16 Installation of Stainless Steel Vent Collar Assembly of Stainless Steel Venting17a Star-34 Connection to Vent Collar 18 Z-Vent III Connection to Vent Collar 19 SAF-T Vent EZ Seal Connection to Vent Collar 20 FasNSeal Connection to Vent Collar Condensate Trap and Drain Line 21 Condensate Piping Arrangement Gas Connection To Boiler Viii Gas PipingIX System Piping General System Piping PrecautionsSystem Design Flow Requirements Through BoilerMethod 1 Primary/Secondary Piping Piping Method #1 Heat Only Piping Method #1 Heat + Indirect Water Heater 4b Piping Method #1 Indirect Water Heater Loop Piping Shaded Pipe and Circulator Sizing for Indirect Water Heater Loop Pipe and Circulator Sizing for Boiler LoopFitting Equivalent Lengths Boiler Head Loss Standard Piping Installation RequirementsPiping for Special Situations 11 Chiller Piping Wiring Wiring Connections Diagram Ladder Diagram Page Never Attempt to Fill a HOT Empty Boiler XI Start-up and CheckoutWater Quality and Boiler Water Additives FCM Series Lighting and Operating Instructions SWT Typical CO2/O2 Combustion Readings Range Gas Valve DetailPage XII Operation Normal Display In Standby ModePage Basic Menu Tree First Digit Boiler Status Boiler StatusOutdoor Reset Curve XIII. Service and Maintenance Page No Error Code Displayed XIV. TroubleshootingCode Condition Possible Causes Soft Lockout Codes DisplayedHard Lockout Codes Displayed XV Parts Page KEY Description Parts ListPage Parts List Page Page Page DISP4D 150 151 152 153 154 155 156 157 158 159 160 161 162 Page Page Page Page Page Limited Warranty