Burnham 101008-01R1-2/07 manual U.S. Boiler Concentric Vent Components Vent Option, Size Vent

Page 16

TABLE 7.4: U.S. BOILER CONCENTRIC VENT COMPONENTS (VENT OPTION 1)

 

 

 

USED ON

 

PART NO.

DESCRIPTION

SIZE

VENT

COMMENTS

 

 

 

OPTION #

 

101005-01

80/125 x 60/100mm

80/125 x

1

INCLUDED WITH STANDARD BOILER

REDUCING ELBOW

60/100mm

 

 

 

 

 

 

 

 

101006-01

TERMINAL SECTION

60/100mm

1

INCLUDED WITH STANDARD BOILER

101007-01

WALL GROMMET

60/100mm

1

INCLUDED WITH STANDARD BOILER

100994-01

39” STRAIGHT

60/100mm

1

OPTIONAL - MAY NOT BE CUT

101161-01

78" STRAIGHT

60/100mm

1

OPTIONAL - MAY NOT BE CUT

100995-01

19 1/2” STRAIGHT

60/100mm

1

OPTIONAL - CAN BE CUT

100996-01

90 DEGREE ELBOW

60/100mm

1

OPTIONAL

101162-01

39" STRAIGHT

80/125mm

1

OPTIONAL - CAN BE CUT (Note #1)

100997-01

45 DEGREE ELBOW

60/100mm

1

OPTIONAL

Note #1: On 60/100mm vent systems, this may only be used between the boiler and the first 80/125 x 60/100 Reducing Elbow (see text).

TABLE 7.5: PERMISSIBLE STAINLESS STEEL VENT SYSTEMS AND

PRINCIPLE VENT COMPONENTS (VENT OPTIONS 2, 5)

MANUFACTURER

VENT SYSTEM

SIZE

COMPONENT

PART NUMBER

 

 

3

BOILER COLLAR

101004-01

HEAT FAB

SAF-T VENT

3

WALL THIMBLE

HEAT FAB 7393, 7393GCS, 5391CI

EZ SEAL

3

HORIZONTAL TERMINAL

8110701

 

 

 

 

 

 

 

 

3

VERTICAL TERMINAL

HEAT FAB 9392

PROTECH

 

3

BOILER COLLAR

101004-01

 

 

 

 

 

3

WALL THIMBLE

FSWT3

SYSTEMS

FASNSEAL

3

HORIZONTAL TERMINAL

8110701

INC.

 

 

 

3

VERTICAL TERMINAL

FSBS3

 

SVE

3

BOILER COLLAR

101004-01

 

 

 

 

 

3

WALL THIMBLE

2SVSWTEF03

Z-FLEX

SERIES III

3

HORIZONTAL TERMINAL

8110701

 

(“Z-VENT III”)

 

 

3

VERTICAL TERMINAL

24SVSTPF03

 

 

3

BOILER COLLAR

101004-01

FLEX-L INTL.

STAR-34

3

WALL THIMBLE

SR03WT15

3

HORIZONTAL TERMINAL

8110701

 

 

 

 

3

VERTICAL TERMINAL

SRTP-03

NOTES:

1)See vent system manufacturer’s literature for other part numbers that are required such as straight pipe, elbows, firestops and vent supports.

2)Part No. 101004-01 collar replaces factory-mounted concentric collar (Figure 7.16).

16

Image 16
Contents Freedom Table of Contents Specifications Product DescriptionII Specifications Maximum Vent LengthsIII Before Installing IV Locating the BoilerClearances To Combustible Or Non-combustible Material Clearances from Vent Piping to Combustible Construction Wall Mounting Mounting The BoilerFloor Mounting Wall Mounting Hole Locations Boiler Mounting/Hardware VI Air for Ventilation Page VII Venting Vent System DesignPage Summary of Horizontal Venting Options Or PVCHorizontal Concentric Venting Vent Option U.S. Boiler Concentric Vent Components Vent Option Size Vent6c Positioning Vent Terminal Under Overhangs VENT/ AIR Intake Fitting Equivalent Length Summary of Vertical Venting Options RoofRemoving an Existing Boiler From a Common Chimney Never Common Vent a FCM Boiler with Other AppliancesAssembly of U.S. Boiler 60/100mm Concentric Venting 11 Dimension L 12 Cutting Outer Pipe 14 Preparing Terminal Section for Installation in the Wall Assembly of Stainless Steel Venting 16 Installation of Stainless Steel Vent Collar17a Star-34 Connection to Vent Collar 18 Z-Vent III Connection to Vent Collar 19 SAF-T Vent EZ Seal Connection to Vent Collar 20 FasNSeal Connection to Vent Collar Condensate Trap and Drain Line 21 Condensate Piping Arrangement Viii Gas Piping Gas Connection To BoilerGeneral System Piping Precautions IX System PipingSystem Design Flow Requirements Through BoilerMethod 1 Primary/Secondary Piping Piping Method #1 Heat Only Piping Method #1 Heat + Indirect Water Heater 4b Piping Method #1 Indirect Water Heater Loop Piping Shaded Pipe and Circulator Sizing for Boiler Loop Pipe and Circulator Sizing for Indirect Water Heater LoopFitting Equivalent Lengths Standard Piping Installation Requirements Boiler Head LossPiping for Special Situations 11 Chiller Piping Wiring Wiring Connections Diagram Ladder Diagram Page XI Start-up and Checkout Never Attempt to Fill a HOT Empty BoilerWater Quality and Boiler Water Additives FCM Series Lighting and Operating Instructions SWT Gas Valve Detail Typical CO2/O2 Combustion Readings RangePage Normal Display In Standby Mode XII OperationPage Basic Menu Tree Boiler Status First Digit Boiler StatusOutdoor Reset Curve XIII. Service and Maintenance Page XIV. Troubleshooting No Error Code DisplayedSoft Lockout Codes Displayed Code Condition Possible CausesHard Lockout Codes Displayed XV Parts Page Parts List KEY DescriptionPage Parts List Page Page Page DISP4D 150 151 152 153 154 155 156 157 158 159 160 161 162 Page Page Page Page Page Limited Warranty