Burnham
101008-01R1-2/07
manual
FCM Series Lighting and Operating Instructions
Troubleshooting
Specs
Install
Parts list
Wiring Connections Diagram
Wiring
Warranty
Dimension
Maintenance
Outdoor Reset Curve
Page 49
FCM Series Lighting and Operating Instructions
49
Page 48
Page 50
Image 49
Page 48
Page 50
Contents
Freedom
Table of Contents
Product Description
Specifications
II Specifications
Maximum Vent Lengths
IV Locating the Boiler
III Before Installing
Clearances To Combustible Or Non-combustible Material
Clearances from Vent Piping to Combustible Construction
Wall Mounting
Mounting The Boiler
Floor Mounting
Wall Mounting Hole Locations
Boiler Mounting/Hardware
VI Air for Ventilation
Page
Vent System Design
VII Venting
Page
Or PVC
Summary of Horizontal Venting Options
Horizontal Concentric Venting Vent Option
Size Vent
U.S. Boiler Concentric Vent Components Vent Option
6c Positioning Vent Terminal Under Overhangs
VENT/ AIR Intake Fitting Equivalent Length
Roof
Summary of Vertical Venting Options
Never Common Vent a FCM Boiler with Other Appliances
Removing an Existing Boiler From a Common Chimney
Assembly of U.S. Boiler 60/100mm Concentric Venting
11 Dimension L
12 Cutting Outer Pipe
14 Preparing Terminal Section for Installation in the Wall
16 Installation of Stainless Steel Vent Collar
Assembly of Stainless Steel Venting
17a Star-34 Connection to Vent Collar
18 Z-Vent III Connection to Vent Collar
19 SAF-T Vent EZ Seal Connection to Vent Collar
20 FasNSeal Connection to Vent Collar
Condensate Trap and Drain Line
21 Condensate Piping Arrangement
Gas Connection To Boiler
Viii Gas Piping
IX System Piping
General System Piping Precautions
System Design
Flow Requirements Through Boiler
Method 1 Primary/Secondary Piping
Piping Method #1 Heat Only
Piping Method #1 Heat + Indirect Water Heater
4b Piping Method #1 Indirect Water Heater Loop Piping Shaded
Pipe and Circulator Sizing for Indirect Water Heater Loop
Pipe and Circulator Sizing for Boiler Loop
Fitting Equivalent Lengths
Boiler Head Loss
Standard Piping Installation Requirements
Piping for Special Situations
11 Chiller Piping
Wiring
Wiring Connections Diagram
Ladder Diagram
Page
Never Attempt to Fill a HOT Empty Boiler
XI Start-up and Checkout
Water Quality and Boiler Water Additives
FCM Series Lighting and Operating Instructions
SWT
Typical CO2/O2 Combustion Readings Range
Gas Valve Detail
Page
XII Operation
Normal Display In Standby Mode
Page
Basic Menu Tree
First Digit Boiler Status
Boiler Status
Outdoor Reset Curve
XIII. Service and Maintenance
Page
No Error Code Displayed
XIV. Troubleshooting
Code Condition Possible Causes
Soft Lockout Codes Displayed
Hard Lockout Codes Displayed
XV Parts
Page
KEY Description
Parts List
Page
Parts List
Page
Page
Page
DISP4D
150 151 152 153 154 155
156 157 158 159 160 161
162
Page
Page
Page
Page
Page
Limited Warranty
Related pages
Troubleshooting for ProForm PFTL69806.0
Technical Specifications for Cisco Systems 520
Operating indicator light for Samsung NP940X3G-K01US
Section Viii Part Diagram for Woodstock W1500
HOW to Prepare the Wrist Receiver for Polar M91TI
Concrete Installation for Omnimount OL200FT
Exploded View and Parts List Control Panel for Briggs & Stratton 30244
Language Code List for Toshiba SD-43HK
Timer for Samsung LH65TCQMBC/EN
How to request Kenmore microwave warranty service?
(#)
Top
Page
Image
Contents