Blodgett SHO-G manual Pressure Regulation and Testing, Inlet Pressure Natural Propane, KPa

Page 16

Installation

Gas Connection

PRESSURE REGULATION AND TESTING

SHO-G ovens are rated at 50,000 BTU/Hr. (14.6 kW) (53 MJ) per section. Each oven has been ad- justed at the factory to operate with the type of gas specified on the rating plate.

Inlet Pressure

 

Natural

Propane

 

 

 

 

 

 

 

 

Min

 

Max

Min

 

Max

 

 

 

 

 

 

 

W.C.

7.0

 

10.5

11.0

 

13.0

 

 

 

 

 

 

 

kPa

1.742

 

2.61

2.74

 

3.23

 

 

 

 

 

 

Manifold Pressure

 

 

 

 

 

 

 

Natural

Propane

 

 

 

 

 

W.C.

 

3.5

 

10.0

 

 

 

 

 

kPa

 

.87

 

2.49

DInlet Pressure --- the pressure of the gas before it reaches the oven.

DManifold Pressure --- the pressure of the gas as it enters the main burner(s).

DMin --- the minimum pressure recommended to operate the oven.

D Max --- the maximum pressure at which the manufacturer warrants the oven’s operation.

Each oven is supplied with a regulator to maintain the proper gas pressure. The regulator is essen- tial to the proper operation of the oven and should not be removed. It is preset to provide the oven with 3.5” W.C. (0.87 kPa) for natural gas and 10.0” W.C. (2.50 kPa) for Propane at the manifold.

DO NOT INSTALL AN ADDITIONAL REGULATOR WHERE THE OVEN CONNECTS TO THE GAS SUPPLY UNLESS THE INLET PRESSURE IS ABOVE MAXIMUM.

Prior to connecting the oven, gas lines should be thoroughly purged of all metal filings, shavings, pipe dope, and other debris. After connection, the oven should be checked for correct gas pressure.

The oven and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (13.85” W.C., 3.45 kPa).

The oven must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas piping system at test pressures equal or less than 1/2 psig (13.85” W.C., 3.45 kPa).

Gas Connection 2.5” (64 mm)

Gas Connection 3.75” (85.7 mm)

Figure 10

12

Image 16
Contents SHO-G Avertissement Reputation YOU can Count on Page Table of Contents/Table des Matières Oven Description and Specifications IntroductionS Speci Fications SH1G/AB Ca na d a a nd G e nera l Ex p o rtOven Components Installation Delivery and LocationDelivery and Inspection Oven LocationOven Assembly NSF BoltsCaster Assembly LEG AttachmentCasters for Single and Double Stacked Ovens Low Profile Casters for Double Stacked OvensDouble Section Assembly Oven Leveling Canadian installations Australia and general export installationsInstalling the canopy hood draft diverter Ventilation15cm Installing the draft hood Direct Flue ArrangementFlue Diameter Oven Single DoubleGeneral export installations Utility Connections --- Standards and CodesGas Connection GAS PipingPressure Regulation and Testing Inlet Pressure Natural PropaneKPa Manifold Pressure Natural PropaneGAS Hose Restraint Electrical Specifications Electrical ConnectionAdjustments Associated with Initial Installation Initial StartupSafety Information Safety TipsWhat to do in the event of a power failure General safety tipsControl Description Standard ControlOperation General Guidelines for Operating Personnel Operating TipsProduct Temperature Time # Shelves Meats PoultryFish and Seafood CheeseMaintenance Cleaning and Preventative MaintenanceCleaning the Oven Preventative MaintenanceTroubleshooting Guide Possible Causes Suggested RemedySpecifications Pour GAZ -- SH1G/AB Description et Spécifications du FourÉléments du Four Livraison ET Inspection Livraison et ImplantationImplantation DU Four Montage du Four Boulons NSFAssemblage DES Pieds Montage DES RoulettesRoulettes pour four simple ou pour four super- posés Roulettes de bas profile pour deux fours super- posésAvertissement Montage DE LA Section DoubleMise À Niveau DU Four Installation aux États-- Unis et au Canada Généralités concernant les installations à l’ex- portationInstallation du déviateur de tirage Hotte D’ÉVACUATION Type VoûteInstallation de la hotte de tirage EN Prise DirecteDiamètre DU Cheminée Four Simple DoubleBranchements de Service --- Normes et Codes Équipement De Service d’alimentation De Gaz siLongeur Dimensions nominales De conduit Pieds Branchement de GazConduit DE GAZ ExemplePression à l’entrée Gaz Naturel Gaz Propane Réglage ET Test DE PressionPression au collecteur Gaz Naturel Gaz Propane Retenue DU Tuyau DE GAZ Spécifications Électriques Raccordement ÉlectriqueEt Canada Réglages À Faire Lors DE L’INSTALLA- Tion Initiale Mise en Marche InitialeUtilisation Informations de SécuritéConseils DE Sécurité Que faire en cas de panne de secteurDescription DES Commandes Commandes standardUtilisation Consignes Générales à l’Intention des Utilasateurs ConseilsAliment Température Durée Étagères Viandes VolaillesPoisson et Fruits de Mer FromagesEntretien Nettoyage et Entretien PréventifNettoyage DES Fours Entretien PréventifGuide de Détection des Pannes Causes Probables SuggestionGuide de Détection des Pannes Insert Wiring Diagram Here Placer Schéma DE Câblage ICI