Chapter 3:
Hardware Installation
This chapter describes how to install the hardware unit.
Before You Begin
1.Before installing the hub, verify that the electrical values meet the following specifications.
AC Power
100 to 240V (± 10%)
Frequency
50 to 60Hz (± 3Hz)
The hub is equipped with a power supply that automatically detects the input voltage level.
2.Leave at least 10 cm. of space at the front and back of the hub for ventilation. We recommend that the hub be installed in a cool and dry area.
3.If you plan to stack the hubs in a mounting rack or directly on top of one another, make sure you have all the mounting screws, brackets, and tools you need for proper installation.