System Operation

9.To apply power to the PDU distribution panel, close (turn ON) the Q2 circuit breaker on the PDU.

10.To apply power to the PDU power cords and connected equipment, close (turn ON) the distribution panel breakers.

11.If applicable, close (turn ON) the Cross Tie Output or MCCB Subfeed (X) circuit breaker.