Balcar R410A service manual Elbow Piping Kit, 180

Models: R410A

1 109
Download 109 pages 54.47 Kb
Page 104
Image 104
2 ELBOW PIPING KIT

• After unpacking the unit, examine it carefully if there are possible damage.

2 ELBOW PIPING KIT

CAUTIONS

Connection of Pipes

– 180 –

• Do not install in a place that might increase the vibration of the unit.

• To avoid personal injury (with sharp edges), be careful when handling parts.

• Perform installation work properly according to the Installation Manual.

Inappropriate installation may result in water leakage, electric shock or fire.

• When the air conditioner is installed in a small room, provide appropriate measures to

ensure that the concentration of refrigerant leakage occur in the room does not exceed the

critical level.

• Install the air conditioner securely in a location where the base can sustain the weight

adequately.

• Perform the specified installation work to guard against an earthquake.

If the air conditioner is not installed appropriately, accidents may occur due to the falling unit.

• If refrigerant gas has leaked during the installation work, ventilate the room immediately.

If the leaked refrigerant gas comes in contact with fire, noxious gas may generate.

• After the installation work, confirm that refrigerant gas does not leak.

If refrigerant gas leaks into the room and flows near a fire source, such as a cooking range, noxious gas might

generate.

• Electrical work must be performed by a qualified electrician in accordance with the

Installation Manual. Make sure the air conditioner uses an exclusive power supply.

An insufficient power supply capacity or inappropriate installation may cause fire.

• Use the specified cables for wiring connect the terminals securely fix. To prevent external

forces applied to the terminals from affecting the terminals.

• Conform to the regulations of the local electric company when wiring the power supply.

Inappropriategroundingmay cause electricshock.

• Do not install the air conditioner in a location subject to a risk of exposure to a combustible

For details of installation work, refer to the Installation Manual attached to the indoor unit.

When installing this kit together with a drain up kit (TCB-DP22CE), refer to the Installation Manual attached to the drain up kit.

Please preserve this Manual with the Owner’s Manual of the indoor unit.

Parts List

Name

Shape

Q’ty

Elbow type pipe

 

1

(Gas side)

 

 

 

Elbow type pipe

 

1

(Liquid side)

 

 

 

Pipe thermal insulator

 

1

(Gas side)

 

 

 

Pipe thermal insulator

 

1

(Liquid side)

 

 

 

Be sure to use a double spanner to connect the pipes.

Using a torque wrench, tighten surely with the specified tightening torque the connecting section of flare pipes which connect each unit of the indoor and outdoor units. For the tightening torque, see the following table.

Outer dia. of

Tightening torque

connecting pipe (mm)

(N-m)

 

 

Ø6.4

14 to 18 (1.4 to 1.8kgf-m)

 

 

Ø9.5

14 to 18 (1.4 to 1.8kgf-m)

 

 

Ø12.7

14 to 18 (1.4 to 1.8kgf-m)

 

 

Ø15.9

14 to 18 (1.4 to 1.8kgf-m)

 

 

Thermal Insulating Process

Apply thermal insulation to pipes at liquid side and gas side separately.

Using thermal insulators attached to this part and the indoor unit, apply thermal insulation to connecting section of the pipes surely without clearance.

gas.

If a combustible gas leaks, and stays around the unit, a fire may occur.

Fix it with vinyl tape.

Set the notch upward.

Before Installation

Before installation, open the draw port of the upper pipes. (Sheeted knockout hole)

Draw port of the upper pipes

Attached thermal insulating pipe

Side of pipe procured locally

RTCB-KP12CE TCB-KP22CE

Page 104
Image 104
Balcar R410A service manual Elbow Piping Kit, 180