RAV-SM561, 801CT-E

RAV-SM1101, 1401CT-E

2 SELECTION OF INSTALLATION PLACE

External view

REQUIREMENT

Strictly comply with the following rules to prevent damage of the indoor units and human injury.

Do not put a heavy article on the indoor unit. (Even units are packaged)

Carry in the indoor unit as it is packaged if possible. If carrying in the indoor unit unpacked by necessity, be sure to use buffering cloth, etc. to not damage the unit.

Do not apply force to the other parts (refrigerant pipe, drain pan, foamed parts, or resin parts, etc.).

Carry the package by two or more persons, and do not bundle it with PP band at positions other than specified.

 

 

 

Upper pipe draw-out port (Knockout hole)

 

128

Power supply cable take-in port (Knockout)

216

 

Remote controller cable take- in port

 

84

(Knockout hole)

 

110 76

320 170

position)

53

70

 

 

(Hanging

Left drain size

Refrigerant pipe

 

 

(Liquid side ØC)

 

 

 

 

 

130 50

210

167

105

680

Pipe draw-out port (Knockout hole)

Drain port VP20

(Inner dia. Ø26, hose attached)

114

 

41

(Liquid pipe)

(Gas pipe)

200

216

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B (Hanging position)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Refrigerant pipe (Gas side ØD)

75

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

146

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hanging bolt

 

 

Ceiling surface

 

 

 

 

 

 

Within 50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

Drain pipe connecting port 97

 

 

Remote controller cable take- in port

 

 

 

347

Power supply cable take-in port (Knockout hole)

262

 

Remote controller cable take- in port

 

90

32

(Knockout hole)

 

32

135

92

84

145

 

 

 

 

171

 

Outside air take-in port

 

 

 

(Duct sold separately)(Knockout hole Ø92)

 

 

Pipe hole on wall (Ø100 hole)

Drain left pipe draw-out port (Knockout hole)

Wireless sensor mounting section

Model name

A

B

C

D

 

 

 

 

 

561CT

910

855

Ø6.4

Ø12.7

 

 

 

 

 

801CT

1180

1125

Ø9.5

Ø15.9

 

 

 

1101CT to 1401CT

1595

1540

 

 

 

 

 

 

 

Considering pipe/wire connecting work inside the ceiling after the indoor unit has been hanged, select an installation place and determine piping direction.

If the ceiling has already been set before hanging the main unit, prepare refrigerant pipe, drain pipe, indoor connecting wire, remote controller cord, etc. up to the place where pipe and wire can be connected.

Check the size of the indoor unit, and match the indoor unit size using the attached installation pattern.

How to use attached installation pattern

Using the pattern, positioning of the hanging bolt and pipe hole can be performed.

*As an error to some degree may generate on the pattern size due to temperature and humidity, be sure to confirm the size.

Installation pattern

Ceiling surface

Wall face

– 126 –

Page 50
Image 50
Balcar R410A service manual How to use attached installation pattern, 126, Model name 561CT, 801CT, 1101CT to 1401CT