3. INSTALLATION

<200 V system >

(1) Power switch

(2) Screws [2 pcs]

Operator

3146B

3147B

Green and yellow wire (ground wire)

(3)3-pin power supply connector

(4)Power cord

(5)Staples [5 pcs]

1.Attach an appropriate plug to the power cord (4). (The green and yellow wire is the ground wire.)

2.Insert the power plug into a properly-grounded electrical outlet.

NOTE:

Take care when tapping in the staples

(5) to make sure that they do not pierce the cords.

Do not use extension cords, otherwise machine operation problems may result.

3.Use the six screws to tighten the cover of the control box. Check that none of the cords are being clamped by the cover at this time.

15

BAS-311H