Operator

3. INSTALLATION

<100 V / 400 V system >

(1) Power switch

(2) Screws [2 pcs]

3146B

2348B

Green and yellow wire (ground wire)

3156B

(3)Transformer box

(4)Transformer box plates [2 pcs]

(5)Screw [with washer]

(6)3-pin power supply connector

(7)Staples [6 pcs]

(8)Cord clamps [2 pcs]

(9)Power cord

1.Attach an appropriate plug to the power cord (9). (The green and yellow wire is the ground wire.)

2.Insert the power plug into a properly-grounded AC power supply.

*The inside of the control box uses single-phase power.

NOTE:

If the ground connection is not secure, electric shocks, operating errors or damage to electronic components such as P.C. boards may occur.

Take care when tapping in the staples

(7) to make sure that they do not pierce the cords.

Do not use extension cords, otherwise machine operation problems may result.

3.Use the six screws to tighten the cover of the control box. Check that none of the cords are being clamped by the cover at this time.

BAS-311H16