Carrier 48EK, 48EW, 48EY024-068, 48AW, 48AY020-060, 48AK, 48AJ, 48EJ specifications Install Flue Hood

Models: 48EJ 48AJ 48AK 48EK 48AY020-060 48AW 48EY024-068 48EW

1 118
Download 118 pages 46.64 Kb
Page 28
Image 28
Step 5 — Install Flue Hood

Step 5 — Install Flue Hood

48AJ,AK,AW,AY020-050 AND 48EJ,EK,EW,EY024-048 UNITS — Flue hood is shipped inside gas section of unit. To install, secure flue hood to access panel. See Fig. 20A.

48AJ,AK,AW,AY060 AND 48EJ,EK,EW,EY054-068 UNITS — Flue hood and wind baffle are shipped inside gas section of unit. To install, secure flue hood to access panel. In- stall the two pieces of the wind baffle over the flue hood. See Fig. 20B.

NOTE: When properly installed, flue hood will line up with combustion fan housing. See Fig. 21.

Fig. 21 — Combustion Fan Housing Location

Step 6 — Trap Condensate Drain — See Fig. 5-16 for drain location. Condensate drain is open to atmosphere and must be trapped. Install a trapped drain at the drain location. One 1-in. FPT coupling is provided inside the unit evaporator section for condensate drain connection. A trap at least 4-in. deep must be used. See Fig. 22. Trap must be installed to pre- vent freeze-up.

Condensate pans are sloped so that water will completely drain from the condensate pan to comply with indoor air quali- ty guidelines. The condensate drain pans are not insulated.

Fig. 20A — Flue Hood Location (48AJ,AK,AW,AY020-050 and 48EJ,EK,EW,EY024-048 Units)

GAS SECTION

ACCESS PANEL

FLUE HOOD

WIND

BAFFLE

TOP VIEW

SIDE VIEW

Fig. 20B — Flue Hood Location

(48AJ,AK,AW,AY060 and

48EJ,EK,EW,EY054-068 Units)

Fig. 22 — Condensate Drain Trap Piping Details

(Typical Roof Curb or Slab Mount Shown)

Step 7 — Install Gas Piping — Unit is equipped for use with natural gas. Installation must conform with local building codes or, in the absence of local codes, with the Na- tional Fuel Gas Code, ANSI Z223.1.

Install manual gas shutoff valve with a 1/8-in. NPT pressure tap for test gage connection at unit. Field gas piping must in- clude sediment trap and union. See Fig. 23. An 1/8-in. NPT is also located on the gas manifold adjacent to the gas valve.

Do not pressure test gas supply while connected to unit. Always disconnect union before servicing.

28

Page 28
Image 28
Carrier 48EK, 48EW, 48EY024-068, 48AW, 48AY020-060, 48AK, 48AJ, 48EJ specifications Install Flue Hood