Chapter 2 Preparing for Installation

Site Preparation Checklist

Table 2-2

 

Site Planning Checklist

 

 

 

 

 

 

Task No.

Planning Activity

Verified By Time

Date

 

 

 

 

1

Space evaluation:

 

 

 

Space and layout

 

 

 

Floor covering

 

 

 

Impact and vibration

 

 

 

Lighting

 

 

 

Maintenance access

 

 

 

 

 

 

2

Environmental evaluation:

 

 

 

Ambient temperature

 

 

 

Humidity

 

 

 

Altitude

 

 

 

Atmospheric contamination

 

 

 

Airflow

 

 

 

 

 

 

3

Power evaluation:

 

 

 

Input power type

 

 

 

Power receptacles (Depends on power supply)1

 

 

 

Receptacle proximity to the equipment

 

 

 

Dedicated (separate) circuits for redundant

 

 

 

 

power supplies

 

 

 

UPS for power failures2

 

 

 

DC systems: Proper gauge wire and lugs

 

 

 

 

 

 

4

Grounding evaluation:

 

 

 

Circuit breaker size

 

 

 

CO ground (AC- and DC-powered systems)

 

 

 

 

 

 

5

Cable and interface equipment evaluation:

 

 

 

Cable type

 

 

 

Connector type

 

 

 

Cable distance limitations

 

 

 

Interface equipment (transceivers)

 

 

 

 

 

 

6

EMI evaluation:

 

 

 

Distance limitations for signaling

 

 

 

Site wiring

 

 

 

RFI levels

 

 

 

 

 

 

 

1.Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.

2.Refer to the power supply’s kVA rating as a sizing criteria in determining the output required by the UPS. The power supply’s kVA rating value is listed in the specifications table for each power supply in Appendix A.

 