Chapter 3 Installing the Switch

Attaching the Interface Cables

Figure 3-10 Inserting an SFP Transceiver into a Socket

94126

Step 7 Press the SFP transceiver into the slot firmly with your thumb as shown in Figure 3-11.

Figure 3-11 Latching the SFP Transceiver

192406

Step 8 To verify that the SFP transceiver is seated and latched properly:

a.Grasp the SFP transceiver as shown in Figure 3-12and try to remove it without releasing the latch.

b.If the SFP transceiver cannot be removed, it is installed and seated properly. If the SFP transceiver can be removed, reinsert it and press harder with your thumb, repeating if necessary until it is latched securely into the socket.

 

Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide

3-18

OL-21561-02

Page 60
Image 60
Cisco Systems 4948E-F manual Inserting an SFP Transceiver into a Socket