Appendix D Regulatory Compliance and Safety Information

GR-1089-CORE Issue 3 Documentation Statements

GR-1089-CORE Issue 3 Documentation Statements

Statement 7016—GR-1089-Core Intrabuilding Lightning—Immunity Requirements

Caution To comply with GR-1089-Core intrabuilding lightning-immunity requirements, you must use shielded (screened) cable that is grounded at both ends.

GR-1089-CORE Issue 4 Documentation Statements

Statement 7001—ESD Mitigation

This equipment may be ESD sensitive. Always use an ESD ankle or wrist strap before handling equipment. Connect the equipment end of the ESD strap to an unfinished surface of the equipment chassis or to the ESD jack on the equipment if provided.

Statement 7005—Intra-building Lightning Surge and AC Power Fault

Warning The intra-building port(s) of the equipment or subassembly is suitable for connection to intra-building or unexposed wiring or cabling only. The intra-building port(s) of the equipment or subassembly MUST NOT metallically connect to interfaces that connect to the OSP or its wiring. These interfaces are designed for use as intra-building interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE, Issue 4) and require isolation from the exposed OSP cabling. The addition of Primary Protectors is not sufficient protection in order to connect these interfaces metallically to OSP wiring.

Statement 7012—Equipment Interfacing with AC Power Ports

This equipment shall be connected to AC mains provided with a surge protective device (SPD) at the service equipment complying with NFPA 70, the National Electrical Code (NEC).

Statement 7013—Equipment Bonding Networks

This equipment is suitable for installations utilizing the Common Bonding Network (CBN).

Statement 7014—Installation Location

This equipment is suitable for installation in Network Telecommunications Facilities and locations where the NEC applies.

 

Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide

D-42

OL-21561-02

Page 150
Image 150
Cisco Systems 4948E-F manual GR-1089-CORE Issue 3 Documentation Statements, GR-1089-CORE Issue 4 Documentation Statements