Chapter 3 Installing the Switch
Powering Up the Switch
Powering Up the Switch
This section provides a quick
•Starting the
•Powering Up the Switch, page
Starting the Terminal-Emulation Software
Before you
The
To start the
Step 1 Start the
Step 2 Start a
Step 3 Configure the baud rate and character format of the PC or terminal to match these console port default characteristics:
•9600 baud
•8 data bits
•1 stop bit
•No parity
•None (flow control)
Powering Up the Switch
If your chassis has
Step 1 Switch the power supply power switches to the ON position.
Step 2 Verify power supplies are operating correctly by looking at the INPUT OK and the OUTPUT OK LEDs located on the power supply faceplate. The LEDs should be green when the power supply and the power supply fan are functioning normally.
Also verify that the front panel PS1 LED is lit green. If the chassis is equipped with a second (redundant) power supply, verify that the front panel PS2 LED is also lit green. If the LEDs are not green, refer to the “300 W
|
| Catalyst 4948E and Catalyst |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|