3-3
Cisco SFS 3012R Multifabric Server Switch Hardware Installation Guide
OL-11187-01
Chapter3 Installing and Removin g Server Switch Field Replaceable Units (FRUs)
Adding or Replacing Ethernet or Fibre Channel Gateways
Step7 Push the ejector lever up until it clicks into place, as shown in Figure3-2.
Figure3-2 Closing the Ejector Lever
Adding or Replacing Ethernet or Fibre Channel Gateways
You can add, remove, and swap I/O gateways while your CiscoSFS 3012R Server Switch runs .
However, if the software image on your gateway does not match the software image that runs on your
server switch, you must install the correct software on your gateway. For details, refer to the
install
command in the Cisco SFS 7000 Series Product Family Command Reference.
Chapter4, “Viewing and Updating the Software Image” provides instructions for viewing and updating
the software image. To update a single gateway, use the standard installation procedure, but do not reboot
the chassis. You can simply enable and disable the individual gateway to activate the new software
image.
To install a gateway, perform the following steps:
Step1 Ground yourself using an approved ground wrist strap.
Step2 Remove the blanking panel if one resides in the slot.
Step3 Remove the gateway module from any packaging.
Step4 Extend the ejector lever on the gateway completely.
Step5 Insert the gateway into an expansion module slot such that the ejector lever sits on the bottom-left-hand
side of the module.
180743