3-4
Cisco SFS 3012R Multifabric Server Switch Hardware Installation Guide
OL-11187-01
Chapter3 Installing and Removing Server Switch Field Replaceable Units (FRUs)
Installing an InfiniBand Switch Module
Note You can install gateways in slots 2 (second from left) through 13 (second from right). Populate
your Cisco SFS 3012R Server Switch from left to right.
Step6 Push the gateway module firmly into the slot. The ejector lever begins to close.
Step7 Push the ejector lever up until it clicks into place.
Step8 Follow the procedures in Chapter4, “Viewing and Updating the Software Image” to update or verify the
software image on the gateway module.
Note All cable connections to Ethernet gateways must use shielded RJ45 CAT5 Ethernet cables.
Installing an InfiniBand Switch Module
To install an InfiniBand switch module, perform the following steps:
Step1 Ground yourself using an approved ground wrist strap.
Step2 Remove the blanking panel if one resides in the slot with a number 1 Phillips-head screwdriver.
Step3 Remove the switch module from any packaging.
Step4 Extend the ejector levers on the left-hand side and on the right -hand side of the switch module
completely.
Step5 Insert the switch module into slot 15 or slot 16 such that the ejector levers sit on the bottom of the switch
module.