Commissioning

Inserting the Access Power Rectifiers

Do NOT switch on the AC supply at this stage.

Step 1 – Unpack the rectifiers

Unpack the rectifiers and inspect them carefully for possible damage that may have occurred in transit. Report any damage immediately, using a copy of the Equipment Incident Report (located at the back of this guide) to supply all relevant details. Fax the completed form to your local Powerware DC product representative.

Keep the original packaging. You will need this if any equipment needs to be returned to your nearest authorized service agent for replacement or repair.

Step 2 – Align the rectifier with the burst-out guides in the shelf

Step 3 – Push in the rectifier

To avoid injury to your hands, keep your fingers clear, as shown in the diagram below.

1Slowly push in the rectifier, sliding it along the burst-out guides, as shown below, until it plugs firmly into the backplane connector.

2Tighten the rectifier retaining screw with a Pozidriv® screwdriver.

4-2

Copyright © 2005-2006 Eaton Corporation. All Rights Reserved.

IPN 997-00012-41D December 2006

 

Page 34
Image 34
Eaton Electrical SC200 manual Inserting the Access Power Rectifiers, Commissioning