2. WIRING

Cable fabrication for the cables connected to the 03P9342 board

ξ Signal cable RW-9600 (Between antenna unit and processor unit)

Vinyl sheath

Armor

Shield

 

 

 

 

 

 

 

 

 

 

 

 

60

5

450

Vinyl tape

After exposing cores,

 

 

wind shield around the armor.

 

 

6

 

 

 

14 5 9

 

Coaxial cable

Conductor

Clamp here by cable clamp.

Fold back shield.

Coaxial cable

 

 

ξ Other cables for optional units

Use TTYCS-1 or TTYCS-4 (Japan standard cable) or equivalent.

Armor

Sheath

Shield

φ = 10.1 mm

Conductor

S= 0.75 mm2 φ = 1.11 mm

TTYCS-1

Armor

 

60: Peel paint.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

φ= 16.3 mm

Armor

Sheath

Shield

Conductor

S= 0.75 mm2 φ = 1.11 mm

TTYCS-4

Shield

L= Depends on equipment

Lconnected. Measure at

the processor unit.

Vinyl tape

After exposing cores,

wind shield around the armor.

6

Clamp here by cable clamp.

Wiring for WAGO connector

Press downward.

Terminal opener

Wire

WAGO connector

Twist

Procedures

1.Twist the conductor.

2.Press the terminal opener downward.

3.Insert the wire to hole.

4.Remove the terminal opener.

5.Pull the wire to confirm that it is ecure.

Wiring for Coaxial cable

Clamp shied with bracket.

Tighten conductor with screw.

CAUTION

Do not use crimp-on lug to prevent contact resistance from increasing.

2-10

Page 34
Image 34
Furuno FAR-2827, FAR-2127-BB, FAR-2117-BB, FAR-2817 installation manual TTYCS-1