GE EPM 5200 Group 0, Functions 4-5-Time Delay for Relays 1 and 2 Option - NL, Description, 04.0

Models: EPM 5300 EPM 5200 EPM 5350

1 100
Download 100 pages 46.61 Kb
Page 57
Image 57
9.8: Group 0, Functions 4–5—Time Delay for Relays 1 and 2 (Option – NL)

CHAPTER 9: PROGRAMMING GROUP 0 – GLOBAL METER SETUP

9.8: Group 0, Functions 4–5—Time Delay for Relays 1 and 2 (Option – NL)

GROUP 0, FUNCTIONS 4–5 sets the time delay for Relays 1 and 2 between 0 and 255 seconds. This allows conditions (example below) to exist for a user-specified time period before the relay or alarm activates. If a time greater than 255 seconds is entered, the meter defaults to the maximum value of 255 seconds.

Example: If Relay 1 is set for 300 amps and the amps increase to 301, the Relay trips only after a programmed delay period. If the meter then measures 299 Amps, the Relay returns to its original position, after the programmed delay.

Relay 1: Located in 04.0 & 04.1.

Relay 2: Located in 05.0 & 05.1. (Procedures for both relays are the same).

GROUP AND FUNCTION NUMBER

DESCRIPTION

04.0

Relay 1: On to Off Delay Time

04.1

Relay 1: Off to On Delay Time

05.0

Relay 2: On to Off Delay Time

05.1

Relay 2: Off to On Delay Time

GE Multilin

EPM 5000 series Advanced Power Meters

53

Page 57
Image 57
GE EPM 5200 Group 0, Functions 4-5-Time Delay for Relays 1 and 2 Option - NL, Group And Function Number, Description, 04.0