2

Installing the CMM742 in the PLC

For general information about module and system installation, refer to GFK-0262, Series 90-70 Programmable Controller Installation Manual.

Equipment Required to Perform the Installation Procedures

Make sure you have the items listed below before you begin.

ƒSeries 90-70 PLC rack.

ƒSeries 90-70 power supply.

ƒTo use the AUI port, the power supply must be one of the following types, which provide +12 Vdc for an external transceiver on the AUI port: IC697PWR711, IC697PWR724, or IC697PWR748.

ƒIf the AUI port will not be used, +5 Vdc is all that is required. Under these conditions, power supply IC697PWR710 is sufficient.

ƒA Series 90-70 CPU.

ƒPLC programming software: Logicmaster 90-70 version 6.02 or higher or Control version 1.0 or higher (runs on a personal computer).

ƒEthernet cables and, if using the AUI port, an Ethernet-compatible AUI transceiver. (See Appendix B, “Communications Ports Characteristics”, for more information.)

ƒA serial cable for the Station Manager port on the Ethernet Interface (see Appendix B).

Optional

ƒA terminal or IBM-compatible personal computer equipped with terminal emulation software. Optional

ƒA Phillips-head screwdriver.

Note

If your installation requires CE Mark compliance, please refer to GFK-1179, Installation Requirements for Conformance to Standards, shipped with the PLC programming software, for additional guidelines.

GFK-1541B

Chapter 2 Installation

2-45

Page 58
Image 58
GE GFK-1541B manual Installing the CMM742 in the PLC, Equipment Required to Perform the Installation Procedures