3745 FRU Exchange Procedure
Basic
Board
Grid
Channel
Tail Gate
Rear
Figure 4-131. Channel Tailgate and Basic Board Grid
Location: 01G
Location: 01P
Figure 4-132. Channel Tailgate, Cables, and Basic Board
Installation Procedure
1. Install the new connector flat cables assembly
in the channel tailgate rack.
2. Connect the flat cables to the basic board rear
side. Ensure that the connector is fully
plugged before securing the screw. The
retention screw is not designed to achieve the
connection.
3. Hold the channel tailgate connector with the
two screws.
4. If the customer has restarted the channel ask
him to disable this channel again.
5. Reconnect the channel bus and tag cables
onto the channel tailgate connector.
Chapter 4. 3745 FRU Exchange 4-97