Safety Precautions

If you have ordered either a single- or dual-IRU system that you intend to install on a table top, follow the instructions in these sections:

“Safety Precautions” on page 3

“Unpacking and Inspecting Modules” on page 22

“Installing the IRUs in a Rack” on page 24

“Cabling the System IRUs to a Power Source” on page 31

“Connecting the System Console” on page 36

If you have your own rack, and have ordered system modules with the intention of rackmounting and cabling your own system, follow the instructions in these sections:

“Safety Precautions” on page 3

“Unpacking and Inspecting Modules” on page 22

“Installing the IRUs in a Rack” on page 24

“NUMAlink Cabling the System IRUs” on page 29

“Cabling the System IRUs to a Power Source” on page 31

“Connecting the System Console” on page 36

Safety Precautions

Before you install an Altix 450 system, you should familiarize yourself with the safety precautions discussed in the following subsections:

“Hazard Statements” on page 4

“ESD Precautions” on page 4

“Safety Measures” on page 5

007-4857-002

3

Page 25
Image 25
Intel SGI Altix 450 manual Safety Precautions