Contents
Installing a Rack | . | . | . . . | . | 6 |
Preinstallation Activities | . | . | . . . | . | 6 |
Site Plan Verification | . | . | . . . | . | 6 |
Tools Required | . | . | . . . | . | 7 |
Power Receptacle Verification | . | . | . . . | . | 8 |
Unloading and Moving System Equipment | . | . | . . . | . 12 | |
Unloading the Equipment from the Truck | . | . | . . . | . 12 | |
Inspecting the Shipping Crate | . | . | . . . | . 14 | |
Transporting the Shipping Crate | . | . | . . . | . 15 | |
Removing a Short Rack from the Shipping Crate | . | . | . . . | . 16 | |
Unpacking and Installing the Tall Rack | . | . | . . . | . 18 | |
Positioning and Leveling Racks | . | . | . . . | . 21 | |
Unpacking and Inspecting Modules | . | . | . . . | . 22 | |
Installing the IRUs in a Rack | . | . | . . . | . 24 | |
Determining Space Requirements | . | . | . . . | . 24 | |
Determining Where to Attach Rails in a Rack | . | . | . . . | . 25 | |
Rackmounting IRUs with Shelf Rails | . | . | . . . | . 26 | |
Removing a Rackmounted IRU Module | . | . | . . . | . 28 | |
NUMAlink Cabling the System IRUs | . | . | . . . | . 29 | |
Cabling the System IRUs to a Power Source | . | . | . . . | . 31 | |
Connecting an IRU Module to a Power Source (No Rack) | . | . | . . . | . 31 | |
Connecting System Modules to a Rack Power Source | . | . | . . . | . 34 | |
Connecting the System Console | . | . | . . . | . 36 | |
Operating Your System | . | . | . . . | . 38 | |
Powering the System On and Off | . | . | . . . | . 38 | |
Preparing to Power On | . | . | . . . | . 38 | |
Powering On With Optional System Console and L1/L2 Controller . . | . | . | . . . | . 39 | |
Powering On Manually or With L1 Console | . | . | . . . | . 41 | |
Powering Off at the System Console | . | . | . . . | . 42 | |
Powering Off Manually | . | . | . . . | . 43 | |
L1 Front Panel Controls | . | . | . . . | . 44 | |
Operating the L1 Controller | . | . | . . . | . 45 |
vi |
|