1: System Installation

Top view of short rack

Top view of tall rack

Seismic tie-down attachment points

Casters

Leveling pads

Figure 1-9Seismic Tie-down Attachment Points

Unpacking and Inspecting Modules

This section describes how to unpack and inspect individual IRUs. Follow these instructions if you plan to install individual modules in a rack or on a table top.

Before unpacking your IRUs, inspect the packaging container for evidence of mishandling during transit. If the packaging container is damaged, photograph it for reference. After you remove the contents, keep the damaged container and the packing materials.

Remove the IRU(s) from the packaging container and ensure that all accessories are included. Inspect the IRU(s) and accessories for damage. If the contents appear damaged, file a damage claim with the carrier immediately. In addition, notify your local SGI Customer Support Center (CSC) for any missing, incorrect, or damaged items. For CSC contact information, see http://www.sgi.com/support/supportcenters.html.

Note: When using the IRU as a stand-alone unit (set on a desk or table top) you must secure the IRU and its fan module together with connection plates. IRUs mounted in a rack are held in place by the screws at the front and rear of the unit.

22

007-4857-002

Page 44
Image 44
Intel SGI Altix 450 manual Unpacking and Inspecting Modules, 9Seismic Tie-down Attachment Points