Juniper Networks M10i manual Preparing for Router Installation, Site Preparation Checklist

Models: M10i

1 240
Download 240 pages 53.15 Kb
Page 65
Image 65

Chapter 5

Preparing for Router Installation

This chapter describes how to prepare your site for installation of the M10i Internet router. It discusses the following topics:

Site Preparation Checklist on page 41

Rack Requirements on page 42

Clearance Requirements for Airflow and Hardware Maintenance on page 44

Site Preparation Checklist

The checklist in Table 14 on page 41 summarizes the tasks you need to perform when preparing a site for router installation.

Table 14: Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Environment

 

 

 

Verify that environmental factors such as

“Router Environmental

 

 

temperature and humidity do not exceed router

Specifications” on page 173

 

 

tolerances.

 

 

 

Power

 

 

 

Measure distance between external power

“DC Power, Connection, and Cable

 

 

sources and router installation site.

Specifications” on page 179

 

 

Locate sites for connection of system

“Chassis Grounding” on page 177

 

 

grounding.

 

 

 

Calculate the power consumption and

“Router Power

 

 

requirements.

Requirements” on page 176

 

 

Hardware Configuration

 

 

 

Choose the configuration.

“Hardware Component

 

 

 

Overview” on page 7

 

 

Rack

 

 

 

Verify that your rack meets the minimum

“Rack Requirements” on page 42

 

 

requirements for the installation of the router.

 

 

 

Site Preparation Checklist 41

Page 65
Image 65
Juniper Networks M10i manual Preparing for Router Installation, Site Preparation Checklist