Juniper Networks M10i manual Unpacking the Router, Tools and Parts Required

Models: M10i

1 240
Download 240 pages 53.15 Kb
Page 71
Image 71

Chapter 6

Unpacking the Router

This chapter explains how to unpack the router and verify the parts received. It also describes how to move the mounting brackets and install the cable management system. Before beginning, prepare the installation site as described in “Preparing for Router Installation” on page 41 and review the safety information in “Safety and Regulatory Compliance Information” on page 135, especially “General Safety Guidelines and Warnings” on page 137 and “Installation Safety Guidelines and Warnings” on page 153. This chapter discusses the following topics:

Tools and Parts Required on page 47

Unpacking the Router on page 47

Tools and Parts Required

To unpack the router and prepare for installation, you need the following tools:

Utility knife for cutting the sealing tape on the shipping carton

Phillips (+) screwdriver, number 2

Unpacking the Router

The router is shipped in a cardboard carton, held in place with foam packing material. The crate also contains an accessory box, the front-mounting shelf, and the M10i Internet Router Installation Quick Start.

NOTE: The router is maximally protected inside the shipping carton. Do not unpack it until you are ready to begin installation.

To unpack the router, perform these steps:

1.Move the shipping carton to a staging area as close to the installation site as possible.

2.Position the carton so that the arrows are pointing up.

3.Using a utility knife, cut through the sealing tape on the top seam of the carton. Open the top flaps of the carton.

Tools and Parts Required 47

Page 71
Image 71
Juniper Networks M10i manual Unpacking the Router, Tools and Parts Required