User Manual
Hipulse - Single Phase ‘1+N’ UPS System 130 kVA - 110V
10
2.4 Preliminary Checks
Before you install the UPS hardware you should carry out the following preliminary
checks:
1. Verify that the UPS room satisfies the environmental conditions stipulated in the
equipment specification, paying particular attention to the ambient temperature and
air exchange system.
2. Remove any packaging debris, then visually examine the UPS and battery
equipment for transit damage, both internally and externally. Report any such
damage to the shipper immediately.
2.5 Installation Drawings
The following diagrams illustrate the key mechanical characteristics of the various
UPS system cabinets
Fig 2-1: Overall General Arrangement for 130 kVA Single Phase 110V UPS with 6 Pulse
rectifier Single Module and ‘1+N’
Fig 2-2: Cable entry and Foundation details for 130 kVA Single Phase 110V UPS with 6
Pulse rectifier Single Module and ‘1+N’.