5.2Procedure for UPS Start-up: without interrupting power to the load

This

procedure

will

 

describe

 

 

 

how to start the UPS and the

 

 

 

how to transfer the load from

 

 

 

the

 

external

maintenance

 

Main t.

 

bypass to the UPS inverter. It is

 

Bypass

Q3

assumed that the installation is

 

 

 

complete, the system has been

 

 

 

commissioned

by

authorized

 

 

 

personnel

and

the

external

 

 

 

power

isolators

are

closed.

 

 

 

Refer

 

to

Fig

 

5-1

for

Q1

Q2

Q4

corresponding isolators

Q1

to

 

 

 

Q4,

and

Fig

5-2

 

Operator

Input

Bypass

Outpu t

Control Panel for various LEDs

Supply

Isolator

Isolator

and Display indications.

 

 

 

 

 

 

 

6

 

1

 

 

 

2

 

 

 

3

 

INV

 

 

 

 

4

5

7

8

 

 

 

 

Fig 5 - 1: Location of Power Isolators

 

 

 

DISPLAY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

%

 

 

 

 

 

MENU

 

 

 

 

 

 

 

 

ESC

 

 

ENTER

 

 

 

 

 

 

 

9

10

11

12

13

14

15

16

17

18

19

Fig 5 - 2: Operator Control Panel

 

 

 

 

 

 

ENSURE CORRECT PHASE ROTATION

EMERSON NETWORK POWER

3PH-1PH

UPS

1.Close Q3 Maintenance Bypass switch and external switch (inside Maintenance Bypass) to load.

2.Close the output power switch Q4 and the Bypass power switch Q2.

Initializing Window:

After first connecting power to the UPS and closing the isolator, this message will appear on the LCD screen. It persists for about five seconds while the control firmware is loaded by a screen showing various messages with the time and date on the bottom line.

The Module Mimic indicators Bypass supply healthy (1) and after 20 seconds Load on Bypass

(6) will flash and red led (13) will illuminate.