User Manual

Hipulse - Single Phase ‘1+N’ UPS System

130 kVA - 110V

A

 

Sensor

3

 

 

Temperature

2

 

 

(Optional)

1

 

 

 

 

X3

 

 

 

X4

 

 

 

X5

 

 

 

X6

 

 

 

X7

 

V<

 

X8

 

 

 

X9

+

BATTERY

X2

X10

 

CIRCUIT

 

1 2 3 4 5

 

BREAKER

X1

UPS CABINET

X4

 

 

 

 

1

 

 

2

 

 

3

Battery C.B.

 

4

 

5

Controller

 

6

 

 

7

 

 

8

 

 

9

 

 

10

 

 

11

 

 

12

 

+

13

 

14

 

 

15

 

 

16

 

 

17

 

B

 

Sensor

3

 

 

Temperature

2

 

 

(Optional)

1

 

 

 

 

X3

 

 

 

X4

 

 

 

X5

 

 

 

X6

 

 

 

X7

 

V<

 

X8

 

 

 

X9

+

BATTERY

X2

X10

 

CIRCUIT

 

1 2 3 4 5

 

BREAKER

X1

UPS CABINET

X4

 

 

 

 

1

 

 

2

 

 

3

Battery C.B.

 

4

 

5

Controller

 

6

 

 

7

 

 

8

 

 

9

 

 

10

 

 

11

 

 

12

 

+

13

 

14

 

 

15

 

 

16

 

 

17

 

Figure 6-3: Battery Control and Power Connections

A – Half potential switching method

B – Double positive pole method

53

Page 73
Image 73
Liebert 130 kVA user manual Battery Control and Power Connections