Lowrance electronic LMF-200 manual Point Calibration, To execute 3-Point calibration

Models: LMF-200

1 72
Download 72 pages 48.35 Kb
Page 58
Image 58

3-Point Calibration:

3-point calibration is designed for tanks that vary in shape from the top to the bottom. You can begin calibration at any point in the 3-point process, but we recommend starting calibration with an empty tank. In a 3-point calibration, you will set three points, one each for empty, half and full levels.

NOTE:

You DO NOT have to calibrate all three points to complete the calibration and you can calibrate the points (Empty Level, Half Level and Full Level) in any order you wish. Remember: Points that are not calibrated will not be as accurate as points that have been calibrated. For the greatest accuracy, we recommend all three points be calibrated.

To execute 3-Point calibration:

1.Press MENU, select SYSTEM SETUP and press MENU.

2.Highlight B. DEVICES and press MENU, which will open the Bus Devices list.

3.Highlight the fluid level sensor you want to calibrate and press MENU, then select CAL (Calibrate) and press MENU. The Points menu will appear with three options: 2, 3 and 5.

4.Select 3 and press MENU. The Points menu will appear with three options: Empty Lev, Half Lev and Full Lev.

5.Highlight EMPTY LEV and press MENU. The following message will appear: Tnk to Empty lev hit Menu. Press Menu and fill your tank up halfway. If you have a 100 gallon tank, add 50 gallons.

6.Repeat steps 1-4, then select HALF LEV from the Points menu and press MENU. The following message will appear: Tnk to Half lev hit Menu. Press MENU and fill up the tank.

7.Repeat steps 1-4 to access the Points menu, then highlight FULL LEV and press MENU. The following message will appear: Tnk to Full lev hit Menu.

8.Press MENU and let the menus time out, which will take you to the main display.

5-point Calibration

5-point calibration is best suited tanks that vary greatly in shape from top to bottom. You can begin calibration at any point in the 5-point calibration process. We recommend starting calibration with an empty tank. In a five-point calibration you will set five points: Empty Level, 1 Qtr Level, Half Level, 3 Qtr Level and Full Level.

52

Page 58
Image 58
Lowrance electronic LMF-200 manual Point Calibration, To execute 3-Point calibration