OWNERS OPERATING AND INSTALLATION MANUAL
for domestic and standard export ovens
ModelCombinations
FRANÇAIS page
FOR YOUR SAFETY
24-Hour Service Hotline
ENGLISH
Retain This Manual For Future Reference
TABLE OF CONTENTS
SECTION 4 - MAINTENANCE
SECTION 2 - INSTALLATION
SECTION 5 - ELECTRICAL WIRING DIAGRAMS
III. OVEN SPECIFICATIONS
SECTION 1 - DESCRIPTION
I. OVEN USES
II. OVEN COMPONENTS - see Figure
SECTION2-INSTALLATION
ENGLISH
I. BASE PAD KIT - see Figure
ENGLISH
Fig. 2-1 - Base Pad Kit
Quantity
INSTALLATION KIT - see Figure
RESTRICT SERVICE ACCESS
LEAD TO INCREASED SERVICE EXPENSES FOR THE OWNER
III. VENTILATION SYSTEM
IV. ASSEMBLY
B. Restraint Cable Installation
C. Conveyor Installation
ENGLISH
ENGLISH
Figure 2-7 - Installing the Restraint Cable
Figure 2-10 - Checking the conveyor tension
Figure 2-9 - Inserting the Conveyor
V. FINAL ASSEMBLY
VI. ELECTRICAL SUPPLY
ENGLISH
Figure 2-12 - Crumb trays
VII. GAS SUPPLY
DURINGPRESSURETESTINGNOTEONEOFTHEFOLLOWING
rate regulator MUST be installed in the line BEFORE the
pressure testing of that system at test pressure in excess
Figure 2-15 - Flexible Gas Hose Installation
Figure 2-16 - Gas Burner and Piping Assembly
ENGLISH
B. Connection
SECTION 3 - OPERATION
I. LOCATION AND DESCRIPTION OF CONTROLS
NOT SHOWN
C. CONVEYOR Switch Turns the conveyor drive motor on and off
II. NORMAL OPERATION - STEP-BY-STEP
wait for
A. DAILYSTARTUPPROCEDURE
B. DAILYSHUTDOWNPROCEDURE
III. QUICK REFERENCE DIGITAL TEMPERATURE CONTROLLER
Service Key
ENGLISH
Display
IV. QUICK REFERENCE TROUBLESHOOTING
SYMPTOM
PROBLEM
SOLUTION
SECTION4-MAINTENANCE
I. MAINTENANCE - DAILY
Figure 4-1 - Front Cooling Fans
Figure 4-2 - Rear Grills and Motor Shroud Grill
II. MAINTENANCE - MONTHLY
ENGLISH
Figure 4-3 - Removing Air Fingers and Plates
Figure 4-4 - Disassembling the Air Fingers
III. MAINTENANCE - EVERY 3 MONTHS
D. Split Belt Disassembly and Cleaning
ENGLISH
Figure 4-5 - Split Belt Idler Shaft
IV. MAINTENANCE - EVERY 6 MONTHS
ENGLISH
Figure 4-8 - Rear Shrouds and Guard Plates
Figure 4-9 - Fan Belt Tension
V. KEY SPARE PARTS KIT - Available separately. See Figure
ENGLISH
A. Gas Ovens
B. Electric Ovens
WIRING DIAGRAMS
Wiring diagram, PS555G or PS570G Gas Oven, 208/240V, 50/60Hz, 1 Ph
ENGLISH
SECTION 5 - ELECTRICAL
Wiring diagram, PS555E Electric Oven, 208V or 240V, 50/60Hz, 3 Ph
SECTION5-ELECTRICALWIRINGDIAGRAMS
ENGLISH
IMPORTANT diagram for the oven is also
located inside the machinery compartment
An electrical wiring
Fig. 5-3 Wiring diagram, PS555E Electric Oven
pour fours destinés à lexportation intérieure et standard
Modèle
Combinaisons
PS555G à gaz
Service dassistance téléphonique 24 heures
AVERTISSEMENT
Conservez ce manuel pour référence ultérieure
AVERTISSEMENT
TABLE DES MATIÈRES
FRANÇAIS
SECTION 2 - INSTALLATION
page
III. SPÉCIFICATIONS DU FOUR
I. UTILISATIONS DU FOUR
II. COMPOSANTS DU FOUR - Figure
Tableau 1-1 Dimensions
SECTION2-INSTALLATION
Effectuez un essai détanchéité du gaz
I. TROUSSE DE PLAQUE DE POSE - voir Figure
FRANÇAIS
Fig. 2-1 - Trousse de plaque de pose
Quantité
II. TROUSSE DINSTALLATION - Figure
LINSTALLATION DE TEL ÉQUIPEMENT SUR LE FOUR PEUT
RESTREINDRE LACCÈS AUX SERVICES
III. SYSTÈME DE VENTILATION
IV. ASSEMBLAGE
2b. Installation des pieds/roulettes - Fours triples sans pieds
2c. Installation des pieds/roulettes - Fours quadruples
B. Installation du câble de retenue
Figure 2-7 - Installation du câble de retenue
Figure 2-10 - Vérification de la tension du transporteur
Figure 2-8 - Dépose de la roue dentraînement du transporteur
Figure 2-9 - Insertion du transporteur
V. ASSEMBLAGE FINAL
VI. ALIMENTATION EN ÉLECTRICITÉ
FRANÇAIS
Figure 2-12 - Plateaux à miettes
VII. ALIMENTATION EN GAZ
A. Recommandations de plomberie brute pour lalimentation en gaz
FRANÇAIS
DURANTLESSAIDEPRESSION,NOTEZCEQUISUIT
Figure 2-15 - Installation du tuyau à gaz flexible
FRANÇAIS
B. Raccordement
REMARQUE
I. EMPLACEMENT ET DESCRIPTION DES COMMANDES
SECTION3-FONCTIONNEMENT
NON ILLUSTRÉ
Fig. 3-1 - Tableau de commande
II. FONCTIONNEMENT NORMAL - PAS-À-PAS
+ attendez
attendez
A. PROCÉDUREDEMISEENSERVICEQUOTIDIENNE
III. CONSULTATION RAPIDE RÉGULATEUR DE TEMPÉRATURE NUMÉRIQUE
Touche de service
FRANÇAIS
Affichage
IV. CONSULTATION RAPIDE RÉSOLUTION DE PROBLÈMES
SYMPTÔME
PROBLÈME
SOLUTION
SECTION 4 - ENTRETIEN
AVERTISSEMENT
REMARQUE
I. ENTRETIEN - QUOTIDIEN
II. ENTRETIEN - MENSUEL
FRANÇAIS
REMARQUE
REMARQUE
III. ENTRETIEN - TRIMESTRIEL
FRANÇAIS
D. Démontage et nettoyage dune bande divisée
Figure 4-5 - Arbre porteur de bande transporteuse divisée
IV. ENTRETIEN - SEMESTRIEL
FRANÇAIS
E. Courroies de soufflerie
F. Graissage des paliers de ventilateur de soufflerie
A. Fours à gaz
B. Fours électriques
FRANÇAIS
Fig. 4-11 - Trousse de pièces de rechange essentielles
SECTION 5 - SCHÉMAS DE CÂBLAGE
composants
FRANÇAIS
FRANÇAIS
composants
SECTION 5 - SCHÉMAS DE CÂBLAGE
composants
Toastmaster
Elgin, IL 60120 USA
Middleby Cooking
MANUAL DE INSTALACIÓN Y OPERACIÓN DEL PROPIETARIO
para hornos domésticos y de exportación estándar
ModeloCombinaciones
PS555G de gas
AVISO
Una instalación, ajuste, alteración, servicio o mantenimiento
inapropiados pueden causar daños materiales, lesiones personales o
la muerte. Lea detenidamente las instrucciones de instalación
ÍNDICE
ESPAÑOL
SECCIÓN5-DIAGRAMASDELCABLEADOELÉCTRICO
SECCIÓN 2 - INSTALACIÓN
SECCIÓN1-DESCRIPCIÓN
ESPAÑOL
III. ESPECIFICACIONES DEL HORNO
I. USO DEL HORNO
SECCIÓN2-INSTALACIÓN
I. JUEGO DE COJINES DE BASE - ver Figura
ESPAÑOL
Fig. 2-1 - Juego de Cojines de Base
Cantidad
CANCELAR CERTIFICACIONES DE ORGANISMOS
IMPORTANTE
II. JUEGO DE INSTALACIÓN - ver Figura
III. SISTEMA DE VENTILACIÓN
IV. ENSAMBLADO
Figura 2-4 - Patas y ruedas - estándar
Figura 2-5 - Patas y ruedas para el horno triple sin
extensiones de patas
ESPAÑOL
Figura 2-10 - Verificación de la tensión del transportador
Figura 2-7 - Instalación del cable de sujeción
Figura 2-8 - Remoción de la rueda dentada motriz del transportador
V. ENSAMBLADO FINAL
VI. SUMINISTRO ELÉCTRICO
ESPAÑOL
AVISO
VII. SUMINISTRO DE GAS
PRECAUCIÓN
ESPAÑOL
DURANTELASPRUEBASDEPRESIÓNOBSERVELOSIGUIENTE
ESPAÑOL
B. Conexión
NOTA
C. Conversión Según el Tipo de Gas
SECCIÓN 3 - OPERACIÓN
I. UBICACIÓN Y DESCRIPCIÓN DE LOS CONTROLES
NO MOSTRADO
ESPAÑOL
II. OPERACIONES NORMALES - PASO A PASO
IMPORTANTE
+ Espere
Espere
III. REFERENCIA RÁPIDA CONTROLADOR DIGITAL DE TEMPERATURA
ESPAÑOL
Luz SP LOCK
Pantalla
PROBLEMA
IV. REFERENCIA RÁPIDA DIAGNÓSTICO DE AVERÍAS
SÍNTOMA
SOLUCIÓN
SECCIÓN4-MANTENIMIENTO
AVISO
NOTA
I. MANTENIMIENTO - DIARIO
II. MANTENIMIENTO - MENSUAL
ESPAÑOL
Figura 4-3 - Remoción de los dedos de aire y las placas
Figura 4-4 - Desensamblado de los dedos de aire
III. MANTENIMIENTO - TRIMESTRAL
ESPAÑOL
Figura 4-5 - Eje loco de banda doble
Figura 4-6 - Eje impulsor de banda doble
IV. MANTENIMIENTO - SEMESTRAL
ESPAÑOL
E. Correas de los Ventiladores
F. Lubricación de los cojinetes de los ventiladores
A. Hornos de gas
B. Hornos eléctricos
Fig. 4-11 - Juego de Piezas de Repuesto Principales
Item Ctdad. No. de Pieza
5 - DIAGRAMAS DEL CABLEADO
IMPORTANTE
SECCIÓN
ELÉCTRICO
SECCIÓN 5 - DIAGRAMAS DEL CABLEADO ELÉCTRICO
IMPORTANTE
ESPAÑOL
horno
Dentro del
IMPORTANTE
horno
Línea de Servicio Abierta las 24 Horas