Mitsubishi Electronics PUZ-A36NHA2-BS, PUZ-A42NHA2-BS, PUZ-A30NHA2 108, Operating Procedure Photos

Models: PUZ-A36NHA2-BS PUY-A12NHA2 PUY-A42NHA2-BS PUY-A30NHA2 PUZ-A36NHA2 PUY-A36NHA2-BS PUZ-A18NHA2 PUZ-A18NHA2-BS PUY-A30NHA2-BS PUZ-A30NHA2-BS PUY-A18NHA2 PUY-A36NHA2 PUZ-A30NHA2 PUY-A12NHA2-BS PUZ-A24NHA2-BS PUZ-A42NHA2 PUY-A18NHA2-BS PUY-A42NHA2 PUZ-A42NHA2-BS PUY-A24NHA2-BS PUZ-A24NHA2 PUY-A24NHA2

1 120
Download 120 pages 22.49 Kb
Page 108
Image 108

 

OPERATING PROCEDURE

 

PHOTOS

 

 

5. Removing the thermistor <Outdoor> (TH7)

Photo 7

 

 

(1)

Remove the service panel. (See photo 1.)

 

 

 

 

 

 

 

 

Thermistor <Outdoor>

 

(2)

Remove the top panel. (See photo 1.)

 

 

 

 

 

Electrical parts box

 

 

 

 

(TH7)

 

(3)

Disconnect the connector TH7 (red) on the controller circuit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

board in the electrical parts box.

 

 

 

 

 

(4)Loosen the clamp for the lead wire in the rear of the electrical parts box. (See photo 4.)

(5)Pull out the thermistor <Outdoor> (TH7) from the sensor holder.

Note: In case of replacing thermistor <Outdoor> (TH7), replace it together with thermistor <Outdoor 2-phase pipe> (TH6), since they are combined together. Refer to No.4. to remove thermistor

<Outdoor 2-phase pipe>.

Sensor holder

6. Removing the thermistor <Discharge> (TH4)

Photo 8

(1)Remove the service panel. (See photo 1.)

(2)Remove the top panel. (See photo 1.)

(3)Remove the front panel. (See photo 1.)

(4)Remove the back panel. (See photo 1.)

(5)Remove the electrical parts box. (See photo 5.)

(6)Pull out the thermistor <Discharge> (TH4) from the sensor holder. (See photo 8.)

w When attaching the thermistor <Discharge> (TH4), place it to its original position.

 

 

Thermistor <Discharge> (TH4)

 

 

 

 

 

 

7. Removing the 4-way valve coil (21S4)

Photo 9

 

 

 

and linear expansion valve coil (LEV-A)

 

 

 

 

 

(1)

Remove the service panel. (See photo 1.)

 

 

 

4-way valve coil

 

 

4-way valve

(2)

Remove the top panel. (See photo 1.)

 

 

fixing screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(3)Remove the front panel. (See photo 1.)

(4)Remove the conduit cover and cord cover.

(5)Remove the back panel. (See photo 1.)

(6)Remove the electrical parts box. (See photo 5.)

[Removing the 4-way valve coil (21S4)]

(7) Remove 1 4-way valve coil fixing screw (M4 6).

(8) Remove the 4-way valve coil by sliding the coil to the right.

[Removing the linear expansion valve coil (LEV-A) ]

(9)Remove the linear expansion valve coil by sliding the coil upward.

Linear expansion valve

4-way valve coil

(21S4)

Linear expansion valve coil (LEV-A)

108

Page 108
Image 108
Mitsubishi Electronics PUZ-A36NHA2-BS, PUZ-A42NHA2-BS, PUZ-A30NHA2, PUY-A36NHA2, PUY-A24NHA2 108, Operating Procedure Photos