Mitsubishi Electronics PUY-A12NHA2, PUZ-A42NHA2-BS, PUZ-A30NHA2 Service Space, 662-5/8 Air outlet

Models: PUZ-A36NHA2-BS PUY-A12NHA2 PUY-A42NHA2-BS PUY-A30NHA2 PUZ-A36NHA2 PUY-A36NHA2-BS PUZ-A18NHA2 PUZ-A18NHA2-BS PUY-A30NHA2-BS PUZ-A30NHA2-BS PUY-A18NHA2 PUY-A36NHA2 PUZ-A30NHA2 PUY-A12NHA2-BS PUZ-A24NHA2-BS PUZ-A42NHA2 PUY-A18NHA2-BS PUY-A42NHA2 PUZ-A42NHA2-BS PUY-A24NHA2-BS PUZ-A24NHA2 PUY-A24NHA2

1 120
Download 120 pages 22.49 Kb
Page 15
Image 15

PUZ-A42NHA2 PUZ-A42NHA2-BS PUY-A42NHA2 PUY-A42NHA2-BS

Unit : mm<inch>

 

Bolt M10<W3/8>)

 

19<3/4>

notched hole

 

 

2-U Shaped

(Foundation

175

<6-7/8>

 

 

 

600<23-5/8>

Rear Air Intake

 

175

<6-7/8>

13/32>-417<16 9/16>-370<14 7/32>-56<2 25/32>-45<1

3/32>-28<1

 

3/32>-53<2

42<1-21/32>

36 Oval hole

 

12o

 

2-

66<2-5/8>

 

Air outlet

(Foundation Bolt M10<W3/8>)

Terminal Block Left ··· Power supply wiring Right ··· Indoor/Outdoor wiring

950<37-13/32>

Earth terminal

 

322<12-11/16>

330<13>

3/16>-30<1

Handle

panelService

Handle

3/8>-1076<42

Frontpiping cover

Rearpiping cover

pipingBottomhole (Knockout)

 

 

19/32>-447<17 1

*

 

 

 

 

7/16>-443<17 1

*

 

 

1

2

13/16>-71<2

 

 

 

 

71<2-13/16>

Drain hole

5-[33<1-5/16>

 

 

 

145

<5-23/32>

 

 

 

145

<5-23/32>

 

 

 

145

<5-23/32>

 

 

 

220

<8-21/32>

 

23<29/32>

5/8>-219<8

3/16>-81<3

3/16>-30<1

635<25>

19/32>-371<14

 

 

 

 

5/32>-1350<53

 

 

 

 

PIPING-WIRING DIRECTIONS

Piping and wiring connections

can be made from 4 directions:

front, right, rear and below.

 

4

 

 

 

 

FOUNDATION BOLTS

Please secure the unit firmly

with 4 foundation (M10<W3/8>)

bolts. (Bolts and washers must

be purchased locally.)

3

 

 

 

 

SERVICE SPACE

Dimensions of space needed

for service access are

shown in the below diagram.

 

2

 

 

 

 

FREE SPACE (Around the unit)

The diagram below shows a

basic example.

Explantion of particular details is

given in the installation manuals etc.

1

 

 

 

 

Side Air Intake

 

 

 

 

Air Intake

Side Air Intake

 

 

 

 

 

Rear

 

 

<Foundation bolt height>

FOUNDATION

 

 

 

 

 

3/16>-30mm<1

 

 

 

 

 

.Max

 

 

 

 

29/32>-<5

 

11/16>-<19

 

 

 

 

150mm

 

500mm

 

 

 

 

.Min

 

.Min

 

 

 

 

 

 

 

500mm

11/16>-<19

 

 

 

 

 

Min.

 

 

 

 

 

Min. 10mm<3/8>

Service space

 

 

 

FREE

Min. 10mm

<3/8>

 

 

Min. 150mm

<5-29/32>

 

Min. 10mm

<3/8>

 

 

Min. 1000mm

<39-3/8>

When installing the conduit. set the attachment to the inner side of each panel.

1/2 Conduit attachment

Handle

Handle

 

 

 

Conduit hole

(2-[27<1-1/16>Knockout)

Right trunking hole (Knockout)

NotesofExample

Handle

intake

KnockoutPipingHole Details

holeConduit

[1/16>Knockout)-27<1-(2

connctionpipeGASRefrigerant... (FLARE) [15.88(5/8) ...connectionpipeLIQUIDRefrigerant(FLARE) [ 9.52(3/8) ...VALVESTOPofIndicationconnection location.

Air

 

 

 

 

pipingRighthole

(Knockout)

 

1 2 *1

 

 

 

 

7/32>-31<1

2-[22.2<7/8>

 

40<1-9/16>

74<2-19/32>

 

 

 

 

Conduit hole

(2-[27<1-1/16>Knockout)

Rear trunking hole (Knockout)

92

-

5/8>

Rearpiping hole

(Knockout)

 

 

 

[

 

 

 

40<1-9/16>

 

 

<3

 

92<3-5/8>

 

 

 

 

 

65<2-9/16>

 

 

 

 

 

45<1-25/32>

3/16>-55<2

 

 

 

1/16>-27<1

 

 

 

 

 

1/2>-63<2

 

 

 

 

 

 

 

7/8>-73<2

 

 

 

23<29/32>

92

5/8>

 

 

-

 

 

[

<3

 

 

9/16>40<1-

3/16>55<2-

5/8>92<3-

 

75 <2-31/32>

19<3/4>

 

1/2>-63<2

7/8>-73<2

5/8>-92<3

 

25/32>-45<1

1/16>-27<1

23<29/32>

7/8>-73<2

23<29/32>

 

1/2>-<2

 

 

63

1/16>-27<1

 

3/16>-55<2

40<1-9/16>

5/8>

5/8>-92<3 65<2-9/16>

 

-

 

 

92

 

 

<3

 

 

[

 

Front trunking hole (Knockout)

Front piping hole (Knockout)

15

Page 15
Image 15
Mitsubishi Electronics PUY-A12NHA2, PUZ-A42NHA2-BS, PUZ-A30NHA2, PUY-A36NHA2, PUZ-A36NHA2 Service Space, 662-5/8 Air outlet