4-8Windows Setup

2-2: Prepare NEC Express5800/ft series

With the power of NEC Express5800/ft series off, follow the steps below:

1.Prepare NEC Express5800/ft series.

Remove all optional PCI boards.

Mount the PCI modules (for Group1/for Group2), and CPU modules (for Group1/for Group2).

Insert only one hard disk to the slot1 of PCI module for Group1.

Remove all LAN cables.

Remove optional SCSI devices such as a tape device from the internal SCSI connector.

IMPORTANT: Do not mount any hard disk into any slots of any modules other than the specified slots. If multiple hard disks are inserted, the hard disk to install OS cannot be determined.

2.Make the PCI module for Group1 primary.

The location of the parts required for operations and check are shown below.

 

BMC Status LED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PCI module Status LED1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER switch

 

 

 

 

PCI module

 

 

 

 

PCI module

 

 

 

CD-ROM drives

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Status LED2

 

 

 

 

(for Group1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PCI module

CPU modules

 

 

(for Group2)

 

 

 

 

 

 

 

 

 

 

 

Front View