38Installation

Step Action

1Loosen, but do not remove, the rack-mounting screws required to install a cable guide.

2Slide the cable guide onto the loosened screws.

3Tighten the screws to secure the cable guide to the chassis.

--End--

Installing the top cable-management bracket

Install the top cable-management bracket to the 8010co chassis.

Procedure steps

Step Action

1Align the mounting retainers on the inside of the top cable-management bracket with the holes on the front of the chassis.

2Push the sides of the top cable-management bracket into place.

3Insert and tighten the eight screws using a Phillips screwdriver to secure the top cable-management bracket to the chassis.

--End--

Nortel Ethernet Routing Switch 8600

Quick Start

NN46205-310 02.01 Standard

30 May 2008

Copyright © 2008 Nortel Networks

Page 38
Image 38
Nortel Networks NN46205-310 quick start Installing the top cable-management bracket