Installing the side cable-management brackets 39

Procedure job aid: Installing the cable-management brackets

Installing the side cable-management brackets

Install the side cable-management brackets to each side of the 8010co chassis.

Procedure steps

Step Action

1Align the slots on the side cable-management bracket with the rods in the chassis.

2Push the bracket into place.

For more information, see “Procedure job aid: Installing the cable-management brackets” (page 39)

--End--

Nortel Ethernet Routing Switch 8600

Quick Start

NN46205-310 02.01 Standard

30 May 2008

Copyright © 2008 Nortel Networks

Page 39
Image 39
Nortel Networks NN46205-310 quick start Installing the side cable-management brackets