PLACE THE BOILER

D.INSTALL COILS OR PLATES

1.Remove the coil cover plates, gaskets and mounting hardware, located in the Flue Box Carton.

2.Install tankless heaters, if used, in openings #1 and #2. See Figure 2.10 and Table 2.2.

3.Place the cover plates and gaskets over any unused heater openings. Place the cover plate with two 3/4" NPT tappings on the upper flow port opening (Position #2) of the Front Section.

E.HYDROSTATIC TEST THE BOILER

1.Install a drain valve in the Rear Section, Tapping 13. See Figure 8.2.

2.Provide a water supply line to the boiler.

3.Plug all open tappings in the boiler.

4.Provide a means to vent air as the boiler fills.

5.Fill the boiler with water, venting air as water level rises.

6.Pressurize boiler to:

75 psig for 50 psig sections.

120 psig for 80 psig sections.

DO NOT EXCEED THESE PRESSURES.

a)Maintain pressure while checking all joints and fittings for leaks.

7. After inspection is complete, drain the boiler and

Figure 2.10: Tankless Coil Openings

 

 

remove plugs from tappings that are to be used.

 

 

 

 

 

 

 

 

Table 2.2: Tankless Coil Ratings

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heater No.

Heater No.

Heater No.

Two Heaters No.

Two Heaters No.

 

Two Heaters No.

Model

X-1020

X-1021

X-1022

X-1020

X-1021

 

X-1022

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GPM

Location

GPM

Location

GPM

Location

GPM

Location

GPM

Location

 

GPM

Location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LC-04

5.5

2

8.0

1 & 2

 

LC-05R

5.62

2

6.5

2

9.0

1 & 2

9.5

1 & 2

 

LC-05

5.75

2

7.0

2

10.0

1 & 2

10.5

1 & 2

 

LC-06

6.25

2

7.75

2

12.0

1 & 2

13.0

1 & 2

 

LC-07

6.5

2

8.5

2

13.0

2

13.0

1 & 2

15.5

1 & 2

 

15.5

1 & 2

LC-08

7.0

2

9.25

2

13.75

2

14.0

1 & 2

17.5

1 & 2

 

18.0

1 & 2

LC-09

7.25

2

10.0

2

14.5

2

14.5

1 & 2

20.0

1 & 2

 

20.0

1 & 2

LC-10

7.5

2

10.75

2

15.5

2

15.0

1 & 2

21.5

1 & 2

 

22.5

1 & 2

LC-11

8.0

2

11.50

2

16.5

2

16.0

1 & 2

23.5

1 & 2

 

24.5

1 & 2

LC-12

12.25

2

17.5

2

24.5

1 & 2

 

27.0

1 & 2

LCE-13

13

2

18.0

2

26

1 & 2

 

29

1 & 2

LCE-14

13

2

18.75

2

26

1 & 2

 

31.5

1 & 2

LCE-15

13

2

19.5

2

26

1 & 2

 

33.5

1 & 2

LCE-16

13

2

20

2

26

1 & 2

 

35.5

1 & 2

LCE-17

13

2

20

2

26

1 & 2

 

37.5

1 & 2

LCE-18

13

2

20

2

26

1 & 2

 

39.5

1 & 2

LCE-19

13

2

20

2

26

1 & 2

 

40

1 & 2

LCE-20

13

2

20

2

26

1 & 2

 

40

1 & 2

LCE-21

13

2

20

2

26

1 & 2

 

40

1 & 2

LCE-22

13

2

20

2

26

1 & 2

 

40

1 & 2

LCE-23

13

2

20

2

26

1 & 2

 

40

1 & 2

LCE-24

13

2

20

2

26

1 & 2

 

40

1 & 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Above heater ratings are based on intermittent demand for water from 40°F to 140°F with 200°F boiler water.

DANGER: Install mixing valve in hot water supply piping. Water temperature over 125°F can cause severe burns instantly or death from scalds.

17

Page 19
Image 19
PB Heat Gas/Oil Boilers manual Install Coils or Plates, Hydrostatic Test the Boiler, Tankless Coil Ratings