PLACE THE BOILER

H.INSTALL FLUE BAFFLES

1.Remove the Front Cleanout Plate from Front Section.

2.Open Baffles carton. Remove Baffles. For LC Only – Save Ceramic Fiber Liner for Section I. Save Rating Label for Chapter 4. Models LCE-13 through LCE- 20 do not require baffles.

3.Place baffles as shown in Figure 2.14. Three of these are special stainless steel baffles, identified with a 1/4" hole punched in each end. These baffles must be placed in the lowest row of tubes.

4.Install the Front Cleanout Plate.

Figure 2.14: Flue Baffle Locations

I.INSTALL CHAMBER LINER

1.(LCE) Remove Ceramic Fiber Liner from Jacket Carton E. Place the liner on the floor of the combustion chamber. Place the front end of the liner flush with the inside of the Front Section. The liner is 24 inches wide. It will not extend all the way to the rear of the boiler on all boiler sizes. No adhesive is required, just press the liner down firmly.

19

Page 21
Image 21
PB Heat Gas/Oil Boilers manual Install Flue Baffles, Install Chamber Liner