Manuals
/
PB Heat
/
Household Appliance
/
Boiler
PB Heat
Gas/Oil Boilers
manual
Control and Pipe Tapping Locations
Models:
Gas/Oil Boilers
1
37
55
55
Download
55 pages
51.87 Kb
34
35
36
37
38
39
40
41
<
>
Specs
Install
Repair Parts
Series LC Dimensional Diagram
Connect Supply Wiring
Dimension
Maintenance
Jacket Assembly
Boiler Setting
Apply Cleanout Cover Plates
Page 37
Image 37
INSTALL CONTROLS AND TRIM
Figure 8.2: Control and Pipe Tapping Locations
35
Page 36
Page 38
Page 37
Image 37
Page 36
Page 38
Contents
Series LC/LCE
Table of Contents
Special Attention Boxes
Using this Manual
Accessibility Clearances
Preinstallation
Combustion and Ventilation AIR
Clearance from Combustible Construction
Chimney or Vent
Foundation Layout
Boiler Setting
Planning the Layout
Installation Survey
Verify Components
Foundation Lengths
Lwco
2A Series LC Shipping List
Interm Back
2B Series LCE Shipping List
Standard and Optional Jacket Cartons, Front/Back Panels
Standard and Optional Sections for Knockdown Boilers
Standard and Optional Jacket Cartons, Top/Side Panels
6A Burner Mounting Plates
Trim Cartons
6B Burner Mounting Plates
Control Cartons
Packaged Boiler
Place the Boiler
Assembled Block Boiler
Knockdown Boiler
Apply Silcone Sealant
Place the Boiler
Series LC Boiler Assembly Right Side View
Series LCE Boiler Assembly Right Side View
Model
Torque Specification/Procedure
LC/LCE Boiler Section Assembly Sequence
Hydrostatic Test the Boiler
Install Coils or Plates
Tankless Coil Ratings
Install Flue Collar
Apply Cleanout Cover Plates
Install Chamber Liner
Install Flue Baffles
Low Return Temperature Piping, General
LOW System Temperature
Pipe the Boiler
Preparation
@ 20F Output Rise
Return Connections
Size Header
Variable Low Temperature
Constant Low Temperature
Chilled Water Systems
Multiple Boiler Installations
High Flow Rate Piping
Piping for Variable Low Temperature Systems, Single Boiler
Pipe the Boiler
Pipe the Boiler
Assemble the Jacket
Jacket Assembly
Install Burner Mounting Plate
Install the Burner
Venting
Burner Application
Chamber Burner Front Plate Extension Past Jacket Inches
Beckett Carlin Gordon Power Webster Inches Piatt
Install GAS Supply Piping
Install Fuel OIL Piping
Connect Fuel Piping
General
Pipe
Pipe Length
Specific Gravity Multiply Capacity by
Install Safety Relief Valve
Install Controls and Trim
Install Drain Valve
Install LOW Water Cutoffs
Install Control Wiring
Connect Supply Wiring
Pipe Tankless Heaters if Used
Control and Pipe Tapping Locations
Suggested Piping Single Tankless Coil Installation
Check the Piping
Starting the Boiler
Fill the Boiler
RUN Burner CHECK-OUT
Typical Combustion Chamber Pressure and Boiler Draft Loss
Check Boiler Controls
Model Combustion Chamber Pressure Boiler Draft Loss
Maintenance
Placing Boiler in Operation
Maintenance Annual
To Shut Down the Boiler
Daily Maintenance
Monthly Maintenance
Series LC/LCE Boiler Ratings
Boiler Ratings & Dimensions
Series LC Dimensional Diagram
Series LC/LCE Boiler Dimensions
Series LC/LCE Boiler Dimensions
Series LC Boiler Assembly
Repair Parts
Description Part Selection Information Stock Code
1A Series LC Repair Parts
1B Series LC Repair Parts
Series LCE Boiler Assembly
2A Series LCE Repair Parts
2B Series LCE Repair Parts
Page
Page
Series LC/LCE
Top
Page
Image
Contents