Installation

UNPACKING

1.Unpack and inspect all equipment, and verify delivery according to the packing slip.

Before shipping, Pelco connects, tests, and programs each system according to the individual sales order. Contact Pelco immediately if there is any discrepancy in the equipment that you receive.

CM9700-CC1

The following items are supplied with the CM9700-CC1:

1 CM9700-CC1 unit, with front rack ears installed

1 120 VAC, 60 Hz power cord (USA standard)

1 230 VAC, 50 Hz power cord (European standard)

1 Keyboard, PS/2

1 PS/2-to-AT keyboard adapter

1 RCA-to-BNC adapter

CM9700 Resource CD (includes the CM9700-MGR software)

BNC extraction tool

2 Brackets with a set of 6 screws, 8-32 x .250-inch, pan head

2 Adjustable support rail sets (each set includes 1 front-mounting rail and 1 rear-mounting rail), with the following sets of screws

6 Screws, 8-32 x .375-inch, pan head with washers

12 Screws, 10-32 x .375-inch, flat head

4 Screws, 10-32 x .750-inch, Phillips, pan head with washers

6 Screws, 8-32 x .250-inch, Phillips, pan head

CM9770-MXB

The following items are supplied with the CM9770-MXB:

1 CM9770-MXB matrix bay, with front rack ears installed

1 CM9770-MXB mounting baffle, with front and rear rack ears installed

1 120 VAC, 60 Hz power cord (USA standard)

1 230 VAC, 50 Hz power cord (European standard)

1 RJ-45 reversed data cable

1 Sheet of camera number labels (these can be affixed to the BNC cards to correspond to camera input numbers)

16 Screws and washers for mounting the bay

NOTE: The appropriate number of CM9770-VCC cards (camera cards), CM9770-VMC cards (monitor cards), and associated rear panels are added to your system according to your system order.

2.Keep all manuals and cabling with their associated equipment.

3.Locate the following documents:

The System 9770 Port Assignments Sheet. This document contains specific information about your system. All System 9770s are preprogrammed based on your system order.

System 9770 manual binder.

C1555M-G (12/07)

9

Page 9
Image 9
Pelco manual Installation, Unpacking, CM9700-CC1, CM9770-MXB