INSTALLATION

Unpack and inspect all parts carefully. The following parts are supplied:

1 CM6800E Switcher/Controller

410-32 x .750-inch pan head screws

4.500” OD nylon washers

1Power cord

46-foot (1.8 m) straight data cables with RJ-45 connectors

16-foot (1.8 m) reversed data cable with RJ-45 connectors

4RJ-45 wall block terminals

NOTE: There are no user-serviceable parts inside this unit. Only authorized service personnel may open the unit.

MOUNTING

1.Select a suitable location for the CM6800E. It occupies 5.25 inches (13.34 cm) of vertical space, or three rack units (RUs), in a universal mount. The CM6800E must be within 6 feet (1.8 m) of a suitable electrical outlet.

Follow proper installation practices and leave 1 RU above and below the CM6800E for ventilation. If installing a 96 x 16 system, in one vertical rack, leave 1 RU between each CM6800E-48X8 unit for ventilation.

Do not connect the power until the installation is complete. Refer to the System Start-Upsection.

2.The CM6800E is shipped with the rack ears installed at the front. Reposition or remove ears as needed for your application.

POSITION BRACKETS FOR

RACK MOUNTING (REAR)

POSITION BRACKETS FOR

UNDER-TABLE MOUNTING

NOTE: EACH CM6800 COMES

POSITION BRACKETS FOR

POSITION BRACKETS FOR

RACK MOUNTING (FRONT)

WITH 2 RACK EARS

FLUSH MOUNTING

 

 

 

(WALL AND TABLE TOP)

Figure 4. Installing Rack Ears

3.Use supplied pan head screws and washers to mount the CM6800E in a standard 19-inch (48.26 cm) equipment rack or wood or sheet metal screws to mount against a flat surface, according to your installation requirements.

Figure 5. Mounting the CM6800E Matrix Switcher/Controller

C1528M-F (6/05)

13

Page 13
Image 13
Pelco CM6800E-48X8 manual Installation, Mounting