Operator Functions • 3
3-17SV40221 Rev. A
4. Set the blue separator
shield lever to the letter
required.
5. Take the stack of inserts
and fan it to ensure
individual Inserts are not
stuck together.
6. ‘Shingle’ the inserts to be
run so that they look like
the photograph on the right
and place them onto the
feed deck.
The Mail Piece Icon Tree
will show the correct
orientation of the Inserts.
7. Let the Wedge slide down
behind the stack so that
the Inserts are supported.
Note: If Insert Feeders F and G are linked (running the same
inserts), make sure the lever settings in steps 3 and 4 are
set the same on both feeders.
SV40221 Rev A book.indb 3-17 9/14/2004 5:51:14 PM