Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
Right Side Shipping
Bracket
ISBM Removable
Front Panels
Figure 4-2. Removing the ISBM Section Right Side Shipping Bracket
4. Using a forklift (see the caution statement at the beginning of this procedure),
raise the cabinet until the cabinet bottom clears the pallet by approximately
3 mm (1/8").
5. Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping
brackets in a responsible manner.
6. Carefully lower the cabinet until the cabinet base contacts the floor.
7. Repeat Steps 2 through 6 for the remaining cabinet.