UPS SYSTEM INSTALLATION

Pallet

Shipping Bracket

Bolts

Right Side Shipping

Bracket

Shipping Bracket

Bolts

Figure 4-4. Removing the UPM Section Right Side Shipping Bracket

4.3Mechanically Joining the Sections

NOTE The following procedure permits the UPS sections to be installed in a location where there is limited space to slide the sections together from the sides.

NOTE For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the section (see Table 3-1on page 3−2 for cabinet weight).

1.Using a forklift, move the UPM section to the final installed location.

2.Remove one top screw and two bottom screws securing the UPM section wireway panel (see Figure 4-5). Lift the panel straight up to remove it from the panel hanger brackets at the top of the cabinet.

3.Remove the screws securing the top and bottom internal safety shield panels and remove the panels. Retain the hardware for later use.

4.Remove the screws securing the corner channel and remove the channel (see Figure 4-5). Retain the hardware for later use.

EATON Powerware® 9395 UPS (1000–1100 kVA) Installation and Operation Manual S 164201764 Rev 1 www.powerware.com

4−5

Page 49
Image 49
Powerware 10001100 kVA operation manual Mechanically Joining the Sections, Right Side Shipping Bracket Bolts