4−12
NOTE Two cable lugs will be connected to each terminal stud. When connecting the cable lugs, install the first lug on the stud with the raised
barrel portion facing the back of the cabinet. Install the second lug with the raised barrel portion facing the front of the cabinet.
UPM 2 Cable 2G1 & 2G2 Brown
UPM 3 Cable 3G1 & 3G2 Brown
Phase B (E2A)
UPM 1 Cable 1G1 & 1G2 Brown
Phase B (E2A) UPM 4 (FI−UPM) Four UPM Model
AC Input to UPMs
UPM 1 Cable 1G1 & 1G2 Yellow
Phase C (E3A)
UPM 2 Cable 2G1 & 2G2 Yellow
UPM 3 Cable 3G1 & 3G2 Yellow
UPM 4 (FI−UPM) Four UPM Model
UPM 4 (FI−UPM) Four UPM Model
UPM 1 Cable 1G1 & 1G2 Orange
UPM 2 Cable 2G1 & 2G2 Orange
UPM 3 Cable 3G1 & 3G2 Orange
Phase A (E1A)