UPS SYSTEM INSTALLATION

Ground Terminals

Front

 

 

Phase C (E3)

 

Phase B (E2)

AC Input to

UPS Rectifier

 

Phase A (E1)

 

Phase A (E6)

 

Phase B (E7)

AC Input to

UPS Bypass

 

Phase C (E8)

 

Section A–A

Figure 4-19. ISBM Section Power Terminal Detail AA

4−22

EATON Powerware® 9395 UPS (1000–1100 kVA) Installation and Operation Manual S 164201764 Rev 1 www.powerware.com

Page 66
Image 66
Powerware 10001100 kVA operation manual Ground Terminals Front Phase C E3 Phase B E2 AC Input to, Phase C E8 Section A-A